Similar Projects
Last Updated | 10/17/2022 01:37 PM |
Project Title | Rebid Green Lake Community Boathouse |
Physical Address | View project details and contacts |
City, State (County) | Seattle, WA 98103 (King County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Construction Commenced, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $8,367,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ** This project has been awarded to Kassel and Associates, Inc. in the amount of $8,367,000. ** The project involves demolition and replacement of the existing boathouse building (5900). The replacement stpructure will be 2-stories containing boat storage and water-related activities, the project includes excavation, site r,e-grainng and utility 'work to support the :new building. The adjacent si-iellnouse buillding (5700) bathroom will be minimally renovated as well and utilities for. Both buildings will be re pai re d / re p l aced. Deductive 1 - delete all inte-rior finishes, drywall, framing, light, fixtures, plumbing fixtures, hvac ductwork, and architectural elements within the exte-rior building envelope of the sec -mad floor area that includes and is bounded by the following rooms: 215 laundry, 201c passageway, 21.4 lockers, 211 mens wc, 213 unisex wc, 212 unisex wc, 210 womens wc, 201d passageway, 209 lockers, 208 unisex wc and 206 coaches prep. Contractor to provide floor penetrations and. Stub up for all utilities, and shall temporarily install bypass connections for building systems as necessary through these spaces to complete work in other areas, delete rooftop mechanical equipment that directly serve the rooms listed above. Provide temporary enclosure at open ends of 201c and 201d and provide a service access door from 201 hallway deductive 2 - delete all interior finishes, drywall, framing, light fixtures, plumbing fixtures, hvac duc twork, and architectural elements within the exte-rior building envelope of the sec-ond floor area that includes and is bounded by the following rooms: 203 kitchenette, 204 off water training/exercise room, 205 ergometer storage, 201 b janitor, and 201 hallway. Provide temporary enclosure and provide a service access door from 201 a stair located at grid line b-2 Engineer's Estimate: $5,872,565.00, Deductive #1: $(297,769.00), Deductive #2: ($238,144.00) For questions on the Lnclusion Plan; please con-tact Miguel Beltran at Miguel. BP ltran@seattle.gov or 206-684.- 4525, Back-up contact is Carmen Kucinski. at Carmen.Kucinski@ seattle,gov or 206-684-0188. QUESTIONS: Deadline for Contractor questions regard-ing this PARKS project shall be submitted by close of business on May 27,2022 05:00 PM to the PARKS project manager via Garrett.Farrellgseattle.gov. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |