Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

DSTT State of Good Repair Curved NB1612 Rail Replacement
Infrastructure
Bidding
$2,313,000 CJ est. value
Seattle, WA 98164

Precast Concrete Products - Value Blanket
Alteration
Post-Bid
Spokane, WA

Trees and Concrete Upgrade
Alteration
Post-Bid
$285,000 est. value
Clarkston, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Kelsey Creek Picnic Shelter Paving
Infrastructure
Results
$15,000 est. value
Bellevue, WA 98005

DR0515 Repair Fairway 15
Term Contract
Design
$5,000,000 est. value
WA

Russell Creek Project
Alteration
Post-Bid
WA

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

Main Canal Polyurea
Alteration
Post-Bid
Ephrata, WA 98823

Concrete Pavement Repair Project
Infrastructure
Results
Washougal, WA 98671

West Canal Polyurea
Alteration
Post-Bid
Quincy, WA 98848

Ready Mix Concrete
Alteration
Results
$219,175 est. value
Tacoma, WA

Last Updated 10/17/2022 01:37 PM
Project Title

Rebid Green Lake Community Boathouse

Physical Address View project details and contacts
City, State (County) Seattle, WA 98103   (King County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $8,367,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

** This project has been awarded to Kassel and Associates, Inc. in the amount of $8,367,000. ** The project involves demolition and replacement of the existing boathouse building (5900). The replacement stpructure will be 2-stories containing boat storage and water-related activities, the project includes excavation, site r,e-grainng and utility 'work to support the :new building. The adjacent si-iellnouse buillding (5700) bathroom will be minimally renovated as well and utilities for. Both buildings will be re pai re d / re p l aced. Deductive 1 - delete all inte-rior finishes, drywall, framing, light, fixtures, plumbing fixtures, hvac ductwork, and architectural elements within the exte-rior building envelope of the sec -mad floor area that includes and is bounded by the following rooms: 215 laundry, 201c passageway, 21.4 lockers, 211 mens wc, 213 unisex wc, 212 unisex wc, 210 womens wc, 201d passageway, 209 lockers, 208 unisex wc and 206 coaches prep. Contractor to provide floor penetrations and. Stub up for all utilities, and shall temporarily install bypass connections for building systems as necessary through these spaces to complete work in other areas, delete rooftop mechanical equipment that directly serve the rooms listed above. Provide temporary enclosure at open ends of 201c and 201d and provide a service access door from 201 hallway deductive 2 - delete all interior finishes, drywall, framing, light fixtures, plumbing fixtures, hvac duc twork, and architectural elements within the exte-rior building envelope of the sec-ond floor area that includes and is bounded by the following rooms: 203 kitchenette, 204 off water training/exercise room, 205 ergometer storage, 201 b janitor, and 201 hallway. Provide temporary enclosure and provide a service access door from 201 a stair located at grid line b-2 Engineer's Estimate: $5,872,565.00, Deductive #1: $(297,769.00), Deductive #2: ($238,144.00) For questions on the Lnclusion Plan; please con-tact Miguel Beltran at Miguel. BP ltran@seattle.gov or 206-684.- 4525, Back-up contact is Carmen Kucinski. at Carmen.Kucinski@ seattle,gov or 206-684-0188. QUESTIONS: Deadline for Contractor questions regard-ing this PARKS project shall be submitted by close of business on May 27,2022 05:00 PM to the PARKS project manager via Garrett.Farrellgseattle.gov.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents