Similar Projects
Last Updated | 02/17/2022 12:54 PM |
Project Title | FY22 Selmon Expressway Mainline and REL Bridget Pavement Striping |
Physical Address | View project details and contacts |
City, State (County) | Tampa, FL (Hillsborough County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The general Scope of Work consists of, but is not limited to: Providing all the labor, equipment, materials, tools, transportation, supplies, insurance, incidentals, mobilization, demobilization and maintenance of traffic necessary to remove existing pavement markings and raised pavement markers, and to apply raised pavement markers and permanent reflective pavement markings to the Selmon Expressway (SR 618) eastbound and westbound local lane designated bridges and associated concrete surfaces listed in Section 2.01.01, from Hyde Park Blvd. to 22nd Street and CSX, including bridge entrance and exit ramps bridges, and the Reversible Express Lanes (REL) bridges from Twiggs Street to Town Center Blvd. and associated concrete surfaces listed in 2.01.02. Existing pavement markings are to be removed by hydro-blasting. All lane and shoulder widths shall not be reduced from the existing condition. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |