Similar Projects
Ormond Beach Elementary - Art Room Flooring, Ceiling, and Lighting
Alteration
Bidding
$206,000 est. value
Ormond Beach, FL 32174

Installation of LVT Flooring at Pines Point Senior Residence
Alteration
Bidding
Pembroke Pines, FL 33026

Re-Flooring of the Town of Lantana's Development Services Building
Post-Bid
Lantana, FL 33462

Annual Contract - Flooring
Term Contract
Post-Bid
$100,000 to $2,000,000 est. value
West Palm Beach, FL 33411

N--FY20: Building 111 Flooring Repairs
Results
Bay Pines, FL 33744

The Federal Aviation Administration (FAA) has a requirement for the removal and replacement of the existing vinyl composite tile (VCT) and carpet from the PIE Base located At the St. Petersburg International Airport Air Traffic Control Tower.
Results
$15,000 to $25,000 est. value
Clearwater, FL 33762

Flooring Services Countywide
Alteration
Bidding
FL

Floor Covering
Post-Bid
Chipley, FL 32428

Sanding, Painting, and Recoating of Gymnasium Floor
Results
Daytona Beach, FL 32114

Flooring
Term Contract
Bidding
FL

Gymnasium and Stage Flooring-Maintenance and Repair
Term Contract
Post-Bid
Less than $150,000 est. value
Tampa, FL 33601

FCI Marianna, Floor Grinding
Results
$250,000 to $500,000 est. value
Marianna, FL 32446

Epoxy Floor Covering - Crookshank Elementary Kitchen
Alteration
Bidding
Saint Augustine, FL 32084

Vickery Center - Replacement of Gym Floor and Cleaning/Stripping/Waxing of VCT Flooring
Post-Bid
Pensacola, FL 32503

FCI Gym Floor
Results
Marianna, FL 32446

Reported 02/10/2022 12:00 AM
Project Title

Gym Floor Screening and Re-Coating

Physical Address View project details and contacts
City, State (County) Largo, FL   (Pinellas County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work to be performed under this contract consists of furnishing all the labor, materials including performing all work necessary for the completion of gym floor screenings and re-coating. The Prime Contractor shall be a Florida Licensed Gym Floor Screening and Re-Coating Contractor. 1. The preparation and refinishing of existing finished gym floors including field measurement of gym floors. 2. The delivery of all materials to the jobsite. 3. Ability to store materials at room temperature between 55-80 degrees with regulated humidity maintained. 4. Ability to store all materials, including flammable in accordance with the manufacturer’s written instructions and specifications. 5. Ability to maintain secure storage not accessible to students.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents