Similar Projects
Children's National Research and Innovation Campus at Walter Reed
Renovation, Demolition
Construction
Washington, DC 20307

Sibley Memorial Hospital Patient Tower
Renovation
Construction
$38,000,000 est. value
Washington, DC 20016

USAF Engineering Infrastructure Repair (EIR) MATOC
Results
$100,000 to $250,000,000 est. value

Children's National Medical Center at THEARC
Renovation
Construction
Washington, DC 20020

Project Management Services Redevelopment of St. Elizabeths East Campus
New Construction, Demolition
Post-Bid
Washington, DC

Howard University Trauma Center
New Construction, Demolition
Conception
Washington, DC

Capital Caring Hospice at Sibley
Renovation - 5,900 SF
Post-Bid
Washington, DC 20016

MWHC Patient Shower Renovation
Renovation
Post-Bid
Washington, DC

Reported 11/29/2018 12:00 AM
Project Title

R--Construction Management Support Services

Physical Address View project details and contacts
City, State (County) State-Wide: AL, AZ, CT, DC, DE, FL, GA, KY, MA, MD, ME, MI, NC, NH, NJ, NM, NY, OH, PA, PR, RI, SC, TX, UT, VA, VI, VT, WV
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The VHA, PCAC requires contractors to provide non-personal construction management support services for various VA Medical Centers (VAMCs) nationwide. The contractor shall furnish services including, but not limited to project engineering, planning; scheduling; communications; design assessments; safety compliance; testing compliance; record keeping; construction administration; cost estimating /budget control; change management and construction reporting and documentation management control. The contractor shall assist and coordinate review of Schematic Design (SDs), Design Development (DDs) and Construction Drawings (CDs) and assist in providing comments back to the developer s team. Professional design services will not be included in the scope. Services may also include data entry; monitoring/inspecting; reporting; and proposal review and coordination efforts as required. The contractor may also be required to provide a CPM Scheduler capable of developing, maintaining, and/or revising integrated master schedules. Projects include new and ongoing construction and renovations of existing buildings/spaces utilizing the design-build and design-bid-build project delivery approaches. Many of the existing buildings are historic properties. The building types include office buildings, hospitals, clinics, laboratories, warehouses, and other types of real property. Project sizes range from small remodeling or repair projects to multi-million-dollar new buildings or renovations of major existing buildings. At any given time, the projects are in various stages of development from pre-planning through design, construction procurement, construction, and post-construction.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers, Flagpoles.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Casework, Furniture, Office Furniture, Seating, Institutional Furniture, Healthcare Furniture, Multiple Seating.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents