Similar Projects
Utilities - US 60
Infrastructure
Design
$992,109 CJ est. value
Bluejacket, OK 74333

Utilities - US 60
Infrastructure
Design
$992,109 CJ est. value
Bluejacket, OK 74333

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Big Cabin Force Main Relocation Project
Infrastructure
Bidding
$200,000 CJ est. value
Big Cabin, OK 74332

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Replacing Water Line in the 300 and 400 Blocks of North Gunter Street
Infrastructure
Post-Bid
$400,000 est. value
Vinita, OK 74301

Resurface (Asphalt) - SH-10
Infrastructure
Results
$1,415,000 CJ est. value
Welch, OK 74369

Storage and Food Outreach Space - Cherokee Nation
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Vinita, OK 74301

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Vinita Public Library ADA Renovations to an Existing Facility
Infrastructure, Renovation
Post-Bid
$300,000 CJ est. value
Vinita, OK 74301

US 69 - Bridge and Approaches
Infrastructure, Renovation
Design
$1,871,156 CJ est. value
Vinita, OK 74301

Construction of Certain Improvements on the Water Tower 10 Repair and Repainting Project
Renovation, Infrastructure
Post-Bid
$70,000 CJ est. value
Vinita, OK 74301

Bridge Rehabilitation - US 69
Infrastructure
Design
$1,320,760 CJ est. value
Vinita, OK 74301

Electric High Voltage Transmission Line Reconstruction Contractors
Infrastructure
Post-Bid
$200,000 CJ est. value
Vinita, OK 74301

Pavement Rehabilitation - US 69
Infrastructure
Design
$4,907,700 CJ est. value
Vinita, OK 74301

Last Updated 03/17/2023 04:20 AM
Project Title

Utilities - US 60

Physical Address View project details and contacts
City, State (County) Bluejacket, OK 74333   (Craig County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2025
Bids Due View project details and contacts
Estimated Value $1,838,192 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-60: From 0.67 Miles East of Sh-2 Extending East 7.23 Miles.ut Project for 33828(04) As of March 17, 2023, the project is in Design status. Anticipated letting month/year is June, 2024. Length : 7.250 Mi. OKDOT - Utilities - US 60 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents