Similar Projects
Crosby Sports Arena & Recreation Center - Phase 2
New Construction
Conception
Crosby, ND 58730

7th Street and 9th Street Mill Overlay - ENGF 22-33 - City of Bismarck
Infrastructure
Conception
$2,650,000 CJ est. value
Bismarck, ND 58501

Sanford South Fargo Sports Complex
New Construction - 251,922 SF
Design
Fargo, ND 58107

Power Play Hockey Facility
Renovation
Design
$18,000,000 to $23,000,000 est. value
Williston, ND 58801

Bridge Replacement Structure (Re-Bid)
Demolition, New Construction, Infrastructure
Bidding
$490,000 CJ est. value
East Morton, ND 58554

Multiplex for Quarters
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Belcourt, ND 58316

Public Works Facility - BP 2 - West Addition, Roads and Streets, Controlled Storage, Wash Bay, and Brine Shed
Infrastructure, Renovation
Sub-Bidding
$1,400,000 CJ est. value
Bismarck, ND 58504

Statewide Portable Barriers
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Baldwin, ND 58521

Structure Demolition and Site Restoration
Demolition
Post-Bid
Minot, ND

North Dakota State University Indoor Practice Facility - BP #2
New Construction
Post-Bid
Fargo, ND 58105

Ellig Sports Complex Outdoor Track Restoration
Results
Fargo, ND 58102

2021 Buechler/Velva Phase II AML
Results
$400,000 est. value
ND

White Shield Sports Complex
New Construction - 3,439 SF
Construction
Less than $500,000 CJ est. value
Roseglen, ND

NDSU Nodak Insurance Football Performance Complex
New Construction
Construction
Fargo, ND 58105

Interstate 94 / Fire Station - City Of West Fargo
New Construction, Infrastructure - 30,000 SF
Pending Verification
$10,000,000 CJ est. value
West Fargo, ND 58078

Last Updated 08/17/2022 09:08 AM
Project Title

RFP Construction Manager at Risk - Construction Manager at Risk (CMAR) Services for Valley City State University Athletic Complex

Physical Address View project details and contacts
City, State (County) Valley City, ND 58072   (Barnes County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 16, 2022, project was awarded to JE Dunn Construction but awarded amount is not available.** Questions Due: 07/05/2022 02:00 PM CT VCSU is seeking to hire a construction manager at risk for the VCSU Athletic Complex project. Notice of Intent to Award July 29, 2022 Contract Scope of Work This RFQ summarizes and supplements services in the Contract Documents. Documents are cumulative, and CMaR is required to provide services in the RFQ, their proposal and executed contracts. 5.2. No Guarantee for Construction Contract Award There is no guarantee that the University will award the construction phase contract. The CMaR will not be entitled to recover any unreimbursed costs, anticipated profit, or monetary awards for proposal preparation. 5.3. Collaboration The CMaR shall work in collaboration and cooperation with the University and the Architect towards realizing a high-quality project. The University will use electronic document sharing services to facilitate easy distribution of drawings, documents, RFIs, submittal packages, etc., among the project team members. The University will pay all licensing fees for the service. The CMaR shall participate and use the electronic document sharing service. All costs that may be incurred by CMaR for training its staff and/or for using the system shall be included in CMaR fees. The CMaR shall exercise the highest standards of the industry for Integrated Project Delivery to guide its relationships to the other members of the team. Project Requirements o The project construction budget is approximately 18 million dollars, actual budget may vary (excluding CMaR fees, CMaR construction contingency, design and other associated fees, furniture and equipment, and other "soft" costs). o The project commencement date shall be upon the approval of fundraising goals from the VCSU Foundation Office. o The project completion date will be determined when funds have been raised. o The CMaR is required to be licensed in the State of North Dakota with a "Class A" license and must comply with all requirements listed in ND Century Codes Chapter 43-07.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents