Similar Projects
Langlinais Road Expansion - City of Youngsville
Infrastructure
Conception
$21,800,000 est. value
Youngsville, LA

Verot School Road Extension - City of Youngsville
Infrastructure
Conception
$22,100,000 est. value
Youngsville, LA 70592

2021 Roadway Patching and Overlay Project
Infrastructure
Post-Bid
Scott, LA

Rehabilitation of several existing roads in Washington Parish
Infrastructure
Post-Bid

I-10 Atch Basin BR W Baton Rouge P/L
Infrastructure
Results
Lafayette, LA

US 90: Cameron St. Overlay
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
LA

Local Roads (Lafayette)
Infrastructure
Results
$100,000 to $250,000 est. value
LA

LA 697: LA 343 - US 167
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Lafayette, LA 70507

I-49 Interch: LA 726/LA 98/Pont Des Mouton
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Lafayette, LA

LA 182: 1.8 MI N LA 723 - 0.4 MI S LA 98
New Construction
Results
$1,000,000 to $2,500,000 est. value
LA

Urban Asphalt Street Overlay and Rehabilitation 2021
Infrastructure
Results
Lafayette, LA

Dr 4263 Pw 910 Paved Roads - Task Order No. 4
Infrastructure
Results
$4,500,000 est. value

La 98: Roundabout at Mills Street
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

Pump Station #3 Upgrade and Downtown Streetscape
Renovation, Infrastructure
Results
$1,500,000 est. value
LA

Rural Asphalt Street Preservation Project 2022
Infrastructure
Results
$670,000 est. value
Lafayette, LA

Reported 06/16/2022 09:01 AM
Project Title

Louisiana 89 Widening

Physical Address View project details and contacts
City, State (County) Broussard, LA 70518   (Lafayette County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Broussard, Louisiana. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. As of June 15, 2022, this project is in the early planning phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to June 2024. A detailed scope of work has not been determined. Youngsville leaders have advocated for years to acquire maintenance rights over state and parish roads to expedite expansion and improvement projects. Recently, the city successfully secured state capital outlay dollars with help from the city of Broussard for a joint widening project of a stretch of La. 89 that runs through both cities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents