Similar Projects
Art Classroom Renovations
Renovation
Post-Bid
$4,700,000 est. value
Albuquerque, NM 87106

Construction Manager at Risk- HSC Center of Excellence for Orthopedic Surgery and Rehabilitation
Post-Bid
Less than $21,000,000 est. value
Albuquerque, NM 87131

UNM Construction Manager at Risk (CMAR)- UNM Taos College Pathways to Careers Center
Results
Less than $5,575,000 est. value
Albuquerque, NM

UNM Student Health Counseling Center Renovation
Renovation
Results
Albuquerque, NM 87131

UNM Job Order Contracting
Post-Bid
Albuquerque, NM 87131

UNM On-Call Contractors
Results
Albuquerque, NM 87131

UNMH Main Operating Room - Pre-Op and Locker Room Renovations
Renovation
Post-Bid
Less than $1,200,000 est. value
Albuquerque, NM

University of New Mexico Comprehensive Cancer Center
Results
Albuquerque, NM 87131

UNM Valencia Infrastructure
Post-Bid
Less than $3,813,206 est. value
Albuquerque, NM 87131

UNM HSC Construction Manager at Risk (CMAR)- Substance Use and Brain Injury Facility Expansion
Results
Less than $4,000,000 est. value
Albuquerque, NM 87131

UNMH ACC - Facilities - Ambulatory Elevator Refurbishment (4,5,6)
Renovation
Post-Bid
Albuquerque, NM 87106

Formula SAE Motorsports Lab
Results
Albuquerque, NM 87106

Design Professional Services for Student Services Facility
Post-Bid
Albuquerque, NM 87106

Renovate Cube Area, South Wing, IT Building
Renovation - 4,885 SF
Results
Albuquerque, NM 87106

Construction Manager at Risk (CMAR) for the UNM Natural History Science Center
Renovation
Post-Bid
Albuquerque, NM

Reported 05/08/2020 12:00 AM
Project Title

CMAR for the UNM Phase 2 Renovations at Clark Hall Chemistry Building Project

Physical Address View project details and contacts
City, State (County) Albuquerque, NM   (Bernalillo County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents