Similar Projects
HVAC Replacement
Alteration
Bidding
$590,000 est. value
Madison, WI 53704

Replace Air Handling Unit at Fleet Shop
Alteration
Bidding
Oconomowoc, WI 53066

Vendor Service Contract for Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Ionization System Installation
Post-Bid
Lancaster, WI 53813

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

HVAC Upgrade
Results
Less than $225,000 est. value
Madison, WI 53593

HVAC, Hot Water Heaters & Refrigerators
Term Contract
Post-Bid

Kitchen Hood Replacement - MEP
Results
Less than $674,000 est. value
Menomonie, WI 54751

Emergency Furnace Replacements
Term Contract
Post-Bid
Wisconsin Dells, WI 53965

Kitchen Hood Replacement - General
Results
Less than $674,000 est. value
Menomonie, WI 54751

Emergency Furnace Replacement
Term Contract
Post-Bid

Training Kitchen Fire Suppression and Exhaust Replacement
Results
Less than $232,000 est. value
Oshkosh, WI 54901

HVAC Investigations, Testing, and Balancing Services
Post-Bid
Whitefish Bay, WI 53211

Liebert Air Conditioning Unit for Sheriff's Office Communications
Results
Elkhorn, WI 53121

Pioneer, Valley View, and High School Air Conditioning
Post-Bid
Green Bay, WI 54313

Last Updated 09/01/2021 08:37 AM
Project Title

Jail Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Portage, WI 53901   (Columbia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove the existing galvanized BAC FXT-087 cooling tower 2.Install new direct replacement "Baltibond" BAC FXT -087 cooling tower 3. Forced Draft, Crossflow Cooling Tower 4. Quality Assurance - ISO 9001Compliant 5. Unit Energy Efficiency per ASHRAE Standard 90.1-2016 6. CTI Certified Thermal Performance 7. Steel Panels and Structural Members are Constructed of Galvanized Steel Furnished with the BALTIBOND® Corrosion Protection System 8. PVC Film Wet Deck Material & Drift Eliminators 9. Plan A Steel Support by Others 10. Replace Valve for Top Water Inlet Connection 11. Replace Valve for Bottom Outlet Remote Sump Connection

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents