Similar Projects
Last Updated | 09/01/2021 08:37 AM |
Project Title | Jail Cooling Tower Replacement |
Physical Address | View project details and contacts |
City, State (County) | Portage, WI 53901 (Columbia County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Remove the existing galvanized BAC FXT-087 cooling tower 2.Install new direct replacement "Baltibond" BAC FXT -087 cooling tower 3. Forced Draft, Crossflow Cooling Tower 4. Quality Assurance - ISO 9001Compliant 5. Unit Energy Efficiency per ASHRAE Standard 90.1-2016 6. CTI Certified Thermal Performance 7. Steel Panels and Structural Members are Constructed of Galvanized Steel Furnished with the BALTIBOND® Corrosion Protection System 8. PVC Film Wet Deck Material & Drift Eliminators 9. Plan A Steel Support by Others 10. Replace Valve for Top Water Inlet Connection 11. Replace Valve for Bottom Outlet Remote Sump Connection |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |