Similar Projects
Central Library Boiler and Civic Center Water Heater Replacement
Term Contract
Bidding
$200,000 est. value
Newport Beach, CA 92660

Boiler Chiller and Air Handler Rebuild Project at Wings 100 and 400
Alteration
Bidding
Antioch, CA 94509

Sources Sought for Mechanical Repairs in CA RO
Term Contract
Post-Bid
Richmond, CA

Boiler Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

EMS Upgrades at the Main Library
Alteration
Results
$347,500 est. value
Burlingame, CA 94010

Jail Commercial Walk in Freezer Replacement
Alteration
Bidding
$100,000 to $130,000 est. value
Hollister, CA 95023

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Gate Opener Replacement Project for Police District Substations 1 and 2
Alteration
Results
$32,000 est. value
Visalia, CA 93291

Architectural Engineering And Related Professional Technical Support Services
Term Contract
Bidding
CA

Z--Mechanical Repairs
Term Contract
Post-Bid
Richmond, CA 94801

SJC On-Call Mechanical Contract 21-22
Alteration
Results
$1,000,000 est. value
San Jose, CA 95110

On Call Architectural Engineering And Other Related
Term Contract
Bidding
CA

Job Order Contract - Mechanical
Alteration
Post-Bid
Clovis, CA

Orchard Dale Elementary School Modernization Project- Mechanical
Alteration
Results
Whittier, CA 90603

Last Updated 02/23/2022 06:35 AM
Project Title

California Highway Patrol Academy Mechanical System Upgrade

Physical Address View project details and contacts
City, State (County) West Sacramento, CA 95605   (Yolo County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Work consist of demolition and replacement of four existing boilers and two hydronic hot water pumps within the Central Plant; demolition and replacement of existing main sanitary sewer and vent piping located in the crawl space below the cafeteria; demolition and replacement of two existing 2,000 gallon hot water holding tanks in the North and South Dormitory Mechanical Rooms.

Details

Division 02 - Existing Conditions, Physical Decontamination, Mechanical Filtration Decontamination.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents