Similar Projects
Sacramento River Erosion Contract 1
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Sacramento, CA

Storm Drain System Improvement
Infrastructure
Bidding
$7,946,443 est. value
San Jose, CA 95134

Storm Drain System Improvement
Infrastructure
Bidding
$7,946,443 est. value
San Jose, CA 95134

River Trunk Realignment Gravity System Project
Infrastructure
Post-Bid
$24,970,000 est. value
Modesto, CA

As-Needed Sewer Cleaning and Inspection (Fy22)
Infrastructure
Post-Bid
$1,400,000 est. value
San Francisco, CA

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

Cast Iron Sewer Replacement FY 2020-2021 Package IV
Infrastructure
Results
$716,790 est. value
San Jose, CA

Construct Retaining Wall, Culvert and Place HMA
Infrastructure
Bidding
$13,600,000 est. value
Butte Valley, CA

Levee Maintenance Project
Infrastructure
Post-Bid
Stockton, CA 95214

Sanitary Sewer Rehabilitation (Sub-Basin 85-202)
Alteration
Results
$5,900,000 est. value
Oakland, CA

Place CRCP, HMA, MGS, and Water Pollution Control System
Infrastructure
Bidding
$34,000,000 est. value
CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Install steel piles, densify soil, construct approach slabs and RSP
Infrastructure
Bidding
CA

Repair Failing Slope
Infrastructure
Post-Bid
$275,400 est. value
CA

Reported 12/14/2021 07:17 AM
Project Title

Paper Mill Creek Storm Drain Inlet Upgrades Phase One

Physical Address View project details and contacts
City, State (County) Novato, CA 94949   (Marin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding on Hold
Bids Due View project details and contacts
Estimated Value $176,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves General items for Culvert 1, and Culvert 1 Removal and Improvements. Phase 1 Project work shall include, but is not limited to, the following Culvert 1 General Mobilization and demobilization, construction staking, and temporary facilities and controls, site preparation and demolition, and site restoration and hydroseeding. Culvert 1 Removal and Improvements (Sta 2+00 to Sta 2+25) Removal Demo/Remove the existing items culvert inlet structure, 16 LF of 42” RCP culvert, junction box/inlet structure, 14 LF of 36” RCP, and 14 LF of 15” RCP. Improvements Construct culvert headwall, wingwall, apron. Connect new 4 LF 42” RCP pipe to existing with one (1) cast in place concrete collar. Excavate and backfill around culvert headwall, wingwall, and apron as shown on plans. Connect the following items in newly constructed culvert inlet: 36” diameter RCP with two (2) cast in place concrete collars, 15” diameter RCP with two (2) cast in place concrete collars. Install galvanized steel bollards on culvert apron. Install galvanized steel debris rack on culvert inlet.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents