Similar Projects
Meter Testing, Repair, and Replacement Services
Term Contract
Sub-Bidding
Flower Mound, TX 75022

Limestone Rock Asphalt - US 380
Term Contract
Sub-Bidding
$85,000 CJ est. value
Denton, TX 76209

Renovate and Repair Architectural Features IDIQ contract
Term Contract
Post-Bid
$100,000,000 CJ est. value
Fort Hood, TX 76544

Water Distribution, Sanitary Sewer and Storm Drain Facilities to serve Tradition, Central Phase 3A.2
Infrastructure
Post-Bid
$598,000 CJ est. value
Denton, TX 76201

Screening and Retaining Wall Maintenance
Term Contract
Results
$104,900 CJ est. value
Denton, TX 76201

Best value bid - Water & Wastewater Scada System Operations & Maintenance Services
Term Contract
Results
$53,543 CJ est. value
Corinth, TX 76210

SCADA System Maintenance and Repair Services
Term Contract
Sub-Bidding
Lewisville, TX 75057

Building and Grounds Materials, Supplies, Rentals, Repairs and Other Related Services
Term Contract
Post-Bid
Lewisville, TX 75057

Flexible Base - US0380
Term Contract
Sub-Bidding
$13,750 CJ est. value
Denton, TX 76209

2022-2023 Extended District Operations Supplies and Services Phase 2
Term Contract
Post-Bid
Frisco, TX 75033

EOC SCADA System Redundancy Implementation Services Best Value Bid
Term Contract
Sub-Bidding
Corinth, TX 76210

Folding Panel Partition Replacement, Services and Supplies (JOC)
Term Contract
Post-Bid
Lewisville, TX 75057

Briarwood Wastewater Treatment Plant Operations and Maintenance Services
Term Contract
Sub-Bidding
Argyle, TX 76226

Annual Gas Pressure Testing at Denton State Supported Living Center
Term Contract
Post-Bid
Denton, TX 76210

Tree Trimming and Brush Removal - FM0156
Term Contract
Sub-Bidding
$450,720 CJ est. value
Justin, TX 76247

Last Updated 10/03/2023 02:07 PM
Project Title

Lake Ralph Hall - Raw Water Conveyance Program

Physical Address View project details and contacts
City, State (County) Lewisville, TX 75057   (Denton County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is generally described as construction of approximately 23 miles of 66 Raw Water Transmission Pipeline extending from the future Lake Ralph Hall under construction near Ladonia, Texas to the pipelines termination at the Balancing Reservoir near Merit, TX and 5 miles of 72 Raw Water Transmission Pipeline from the Balancing Reservoir to the terminus and connection point on the City of Irving Pipeline. The pipeline will be sectioned into four Segments, 20, 40, 50, and 60/70 (as shown in the attached maps) which will all be constructed concurrently. Construction of the Balancing Reservoir and Flow Control Building will also be constructed on this project. The construction of all portions (4 pipeline segments, balancing reservoir, and delivery point) of the Project applicable to this RFQ are scheduled to start in September 2023 and be complete by an estimated date of May 2025. The construction of the Project will be executed under several separate Construction Contracts, under contract with the CMAR.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents