Similar Projects
Purchase and Installation of Source Capture Removal Systems
Bidding
Irondale, AL

Highlands HVAC Replacement
Bidding
$450,000 est. value
Birmingham, AL 35233

On-Call HVAC Services
Post-Bid
Birmingham, AL 35255

Volker Hall, 5th Floor, Air Handler Replacement
Post-Bid
$210,000 to $245,000 est. value
Birmingham, AL 35233

Biomedical Research Building II, First Floor HVAC Improvement
Results
$65,000 to $85,000 est. value
Birmingham, AL 35233

Edgewood Elementary School and Shades Cahaba Elementary School HVAC Replacements
Results
Birmingham, AL 35209

Birmingham City Schools HVAC Upgrades
Bidding
Birmingham, AL

HVAC Condenser Unit Relocation at the HABD Elyton Village Housing Community
Post-Bid
Birmingham, AL 35233

Cooling Tower Refurbishment
Results
$1,000,000 to $1,100,000 est. value
Birmingham, AL 35233

Cleaning of Hoods and Vents
Post-Bid
Birmingham, AL 35294

Mountain Brook High School Social Science Building RTU Replacements
Results
Less than $320,000 est. value
Mountain Brook, AL

Breathing Air Compressor
Post-Bid
Irondale, AL 35210

Miles College Kirkendoll LRC HVAC Upgrade
Results
Fairfield, AL 35064

Jefferson County Alabama Mechanical Equipment Asset Program Fy20
Post-Bid
AL

HVAC Upgrades for Media Center and Nurses Station, Westhills Elementary School
Results
Less than $100,000 est. value
Bessemer, AL 35022

Reported 01/24/2020 12:00 AM
Project Title

Henry Peters, 4th Floor, Air Handler Replacement

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35233   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $215,000 to $255,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a maintenance air handler replacement project. The existing air handler serving the 4th and 5th floors of Henry Peters is beyond its service life and shall be replaced. The work shall involve, but not be limited to, an air handler demolition, demolition and new work involving the air handler concrete equipment pad, repair and coatings for the mechanical room floor and walls, a new air handler installation, chilled water piping demolition and installation, steam piping demolition and installation, miscellaneous piping work due to interferences, electrical power circuits for the new air handler, and, a Siemens DDC control system for the new equipment. UAB has pre-purchased an air handler for this project. The Mechanical Contractor shall receive the air handler at their shop, off-load the air handler, store the air handler until the time of installation, transport the air handler to UAB, install the air handler and perform the air handler start-up. The spaces this air handler serves shall be occupied during the time of the demolition and construction work. Work shall proceed in a manner to minimize the onsite demolition and construction time. Work shall also proceed in a manner so as not to interfere with the occupants of the floor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents