Similar Projects
Driveway Apron for Rainbow Lakes Substation
Bidding
Sumterville, FL

CDBG Repaving and Flood and Drainage Improvements
Results
Less than $566,054 est. value
Wildwood, FL 34785

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Sumter County Buena Vista Boulevard Phase 2 Rehabilitation from 300 Feet South of Lake Miona to North of C-44A Roundabout
Results
Wildwood, FL 34785

Sumter County Morse Boulevard Phase 2 from 1,000 Feet South of Stillwater Trail to SR 44
Results
Less than $3,066,768 est. value
Wildwood, FL 34785

Sumter County C-466A Eastbound From Canal Street to Morse Boulevard
Results
Less than $459,977 est. value
Wildwood, FL 34785

25th Street Crossing Improvement Project
Results
Less than $488,888 est. value
FL

Sumter County C-478 from US 301 to the City of Center Hill Southern Limits Resurfacing Project
Results
Less than $970,700 est. value
Wildwood, FL 34785

Walker Avenue, West Palm Avenue, and Jasper Street Overlay
Results
Less than $199,173 est. value
Bushnell, FL 33513

Resurfacing, Reconstruction, Widening
Results
Less than $2,025,463 est. value
FL

Emergency Roadside Assistance Services (I-75)
Results

Design Build Push Button Contract No. 2 – Program Management
Results

Asphalt Painting and Sealing - SECO HQ Building
Results
Sumterville, FL 33585

Emergency Roadway Repair
Results
Less than $1,000,000 est. value

C-478 Resurfacing form SR 471 to Center Hill
Results
Less than $2,278,700 est. value
FL

Last Updated 07/02/2020 04:01 PM
Project Title

Sumter County C-478 Widening Between US 301 and SR 471

Physical Address View project details and contacts
City, State (County) FL   (Sumter County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,498,933
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project's limits are along County Road 478 between US 301 and SR 471. The project's scope of work consists of reconstructing a portion of the existing pavement footprint, milling and resurfacing, widening the existing substandard lane widths to 12 feet, constructing two-foot paved shoulders, regrading roadside swales to tie into natural grade, and other signage/striping improvements. Ancillary drainage improvements include desilting of existing cross drain pipes and side drain pipes as well as replacing grates on existing cross-drain mitered end sections. The project limits include a CSX railroad crossing. Coordination with CSX's contractor (who will be constructing track improvements) and adherence to the CSXT Public Project Information Manual will be required. Additionally, one of the horizontal curves within the project limits is excluded as improvements to this curve are part of a separate County project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents