Similar Projects
I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,000,000 CJ est. value
Tacoma, WA 98409

RFQ Design - Architectural/Engineering Services for Public Works Office and Shops Building Project
New Construction, Demolition, Infrastructure
Conception
Spokane, WA

Koz on West 4th Avenue
New Construction, Infrastructure - 172,000 SF
Design
$98,800,000 CJ est. value
Spokane, WA 99204

Myers Street Sewer Extension
Infrastructure
Design
$50,000 CJ est. value
Eastsound, WA 98245

Little Goose DC System and LV Switchgear Upgrades
Renovation, Infrastructure
Bidding
$25,000,000 CJ est. value
Dayton, WA 99328

98th Avenue Southeast and Southeast 11th Street Slope Stabilization
Infrastructure
Bidding
$525,220 CJ est. value
Bellevue, WA 98004

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Dollar General #24148 / Bridgeport - Revised
New Construction, Infrastructure - 12,480 SF
Post-Bid
$1,500,000 CJ est. value
Bridgeport, WA 98813

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Gridline Apartments
New Construction, Infrastructure
Pending Verification
$66,400,000 CJ est. value
Seattle, WA 98122

11th Avenue East Apartments - Capital Hill
New Construction, Infrastructure
Pending Verification
$15,500,000 CJ est. value
Seattle, WA 98102

208th Street East/Mountain Highway Extension - Pierce County
Infrastructure
Conception
$10,598,000 est. value
Spanaway, WA 98387

2021-23 ER Region Wide Basic Safety - Signing
Infrastructure
Design
$782,000 est. value
Spokane, WA 99201

I-5/Yesler Way to NE 117th St. - Pavement, Deck, and Expansion Joints Project
Infrastructure
Bidding
$275,000,000 CJ est. value
Seattle, WA 98104

Last Updated 09/13/2022 10:14 AM
Project Title

FCID 2022/2023 Capital Improvement Project

Physical Address View project details and contacts
City, State (County) Pasco, WA 99301   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $320,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Base Bid work involves installation of F.C.I.D. provided materials to replace approximately 5,250 feet of 6 inch through 12 inch steel irrigation pipe with PVC pipe. There are two (2) Additive Bid Schedules which also involve installation of F.C.I.D. provided materials and replacement of up to 3,340 feet of 6 inch through 10 inch steel irrigation pipe with PVC pipe. The project is located in the West Pasco area of the City of Pasco. All work shall be completed by MARCH 17, 2023 Each bid must be submitted on the prescribed forms and accompanied by a Certified Check or Bid Bond, payable to F.C.I.D., in the amount not less than 5 percent of the Total Bid Price. The Contract Documents may be examined at the following locations: TRI-CITY CONSTRUCTION COUNCIL, INC., Kennewick, Washington. FRANKLIN COUNTY IRRIGATION DISTRICT, 4320 Road 111, Pasco, Washington. Electronic copies of the Contract Documents may be obtained by contacting Gary Weatherly, PE, J-U-B Engineers, Inc. at gweatherly@jub.com. Bids will only be accepted from those Contractors who are on the Plan holders list. Only those Bidders requesting documents from J-U-B Engineers will be added to the Plan holders list. The Owner reserves the right to waive any informalities or minor defects and to reject any and all Bids. Any Bid may be withdrawn prior to the above scheduled time for the opening of Bids or authorized postponement thereof. Any Bid received after the time and date specified shall not be considered. No Bidder may withdraw a Bid within 30 days after the actual date of the opening thereof. Should there be reasons why the Contract cannot be awarded within the specified period; the time may be extended by mutual agreement between the Owner and Bidder.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents