Similar Projects
Park Ave and El Centro Highway Crossings Construction - WD25UT03 - City of Napa
Infrastructure
Conception
$1,000,000 est. value
Napa, CA

Salvador Avenue Complete Streets - City of Napa
Infrastructure, Alteration
Conception
$1,000,000 est. value
Napa, CA 94558

Smittle Creek Trail Bridges
Infrastructure
Design
$2,000,000 CJ est. value
Napa, CA 94558

Castlevale Winery
New Construction
Design
$2,300,000 est. value
Saint Helena, CA 94574

Sanitary Sewer Manhole Adjustment Project Phase XII
Infrastructure
Bidding
$275,000 CJ est. value
Napa, CA 94558

2022 Bridge Repairs Project
Infrastructure
Bidding
$400,000 CJ est. value
Napa, CA 94558

Silverado Trail Striping
Infrastructure
Sub-Bidding
$750,000 CJ est. value
Napa, CA 94558

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

RFP Engineering - Lift Station A - Sewer Collection Tank Replacement Project
Infrastructure
Post-Bid
$100,000 CJ est. value
Pope Valley, CA 94567

HMA, Roadway Excavation, Structural Conc and Modifying Lighting Systems
Infrastructure
Results
$42,000,000 est. value
CA

HSIP Cycle 10 Striping
Infrastructure
Results
$1,819,353 CJ est. value
Napa, CA 94558

Lincoln Avenue Affordable Apartments
New Construction, Infrastructure
Pending Verification
$29,000,000 CJ est. value
Calistoga, CA 94515

Broadway Commercial Development
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
American Canyon, CA 94503

The Veranda Hotel and Apartments at Indian Springs
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Calistoga, CA 94515

Rancho De Calistoga Sewer Line Bank Stabilization Project
Infrastructure
Bidding
$100,000 CJ est. value
Calistoga, CA 94515

Last Updated 08/09/2022 05:03 PM
Project Title

Crystal Geyser Expansion Phase II

Physical Address View project details and contacts
City, State (County) Calistoga, CA 94515   (Napa County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of two building additions totaling 8,900 square feet and associated improvements including new outdoor tanks at an existing water bottling plant. As of June 3, 2022, construction on phase 1 is underway. The applicant is has put the proposal for Phase II on hold and the future is uncertain. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

8,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents