Similar Projects
Reported | 07/13/2022 01:33 PM |
Project Title | NW Tyler Street, NW Beverly Street to NW Paramore Street - 70134 |
Physical Address | View project details and contacts |
City, State (County) | Topeka, KS (Shawnee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Conceptual Design, Construction Start Expected September 2025 |
Bids Due | View project details and contacts |
Estimated Value | $1,570,829 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Paving for a road / highway in Topeka, Kansas. Conceptual plans call for paving for a road / highway. This project is the third phase of the reconstruction of NW Tyler. Previous phase (701019.00) was from Lyman to Beverly. Moved the design phase to Phase 2 (701019.00 in 2020) as the consultant will already be onsite and the two sections can be designed together. ROW and utility relocation in 2024 with construction in 2025. New section will include sidewalk, curb/gutter and enclosed storm sewers. Project was modified in May 2020 to include only a 2-lane section (was originally proposed as a 3- lane minor arterial). The GO cost for this section was reduced by $160,000 - the projected cost of the 3rd lane. As of July 12, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |