Similar Projects
51 - Airport Asphalt Pavement Repair - 390-2664 - City of Dubuque
Infrastructure
Conception
$325,000 est. value
Dubuque, IA 52003

Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

Dubuque Community YMCA/YWCA
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Dubuque, IA 52001

Dubuque Community YMCA/YWCA
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Dubuque, IA 52001

Aldi #81 / Dubuque
New Construction, Infrastructure - 21,831 SF
Bidding
$4,000,000 CJ est. value
Dubuque, IA 52003

Aldi #81 / Dubuque
New Construction, Infrastructure - 21,831 SF
Bidding
$4,000,000 CJ est. value
Dubuque, IA 52003

Bridge Cleaning
Infrastructure
Post-Bid

HMA Resurfacing and Culvert Replacements on Flannagan Road and James Road
Infrastructure
Post-Bid
$300,000 est. value
Balltown, IA 52073

HMA Crack Filling - IOWA 130
Infrastructure
Results
IA

Pcc Patching
Infrastructure
Results

Five Flags Building Improvements - City of Dubuque
Renovation, Infrastructure
Pending Verification
$25,830,150 CJ est. value
Dubuque, IA 52001

Pennsylvania Avenue Widening - City of Dubuque
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Dubuque, IA 52001

McFadden Farm Water Main Improvement(South Heacock Road From Chavenelle To Pennsylvania Avenue) - 740-2895 - City Of Dubuque
Infrastructure
Conception
$305,800 CJ est. value
Dubuque, IA 52002

Aldi - Plaza 20 / Dubuque
New Construction, Infrastructure - 20,664 SF
Design
$3,400,000 CJ est. value
Dubuque, IA 52003

Construction Hangar 105
New Construction, Infrastructure - 12,000 SF
Bidding
$2,250,000 CJ est. value
Dubuque, IA 52003

Last Updated 04/13/2023 10:53 AM
Project Title

Peosta Street & Burds Road Turn Lane

Physical Address View project details and contacts
City, State (County) Peosta, IA 52068   (Dubuque County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct Peosta Street and Burds Road Turn Lane including all labor, materials, and equipment necessary for constructing new right turn lanes on Peosta Street and Burds Road, replacement of approximately 800 LF of 10-inch watermain, installation of approximately 1,000 LF of storm sewer, and new pavement markings, 2-inch mill and overlay, curb and gutter, City Police Station parking lot, construction of a stormwater pond, and miscellaneous associated work, including cleanup. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied by bid security in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to 5% of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of 5% of the bid. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the City Council Work on the improvements shall commence within ten days of the issuance of a written Notice to Proceed. The Notice to Proceed will be issued upon approval of the contract by the Council and be completed as stated below Liquidated damages in the amount of Five Hundred Dollars ($500.00) for each calendar day after September 29, 2023 until all work in the contract is completed with due allowance for extensions due to conditions beyond the control of the contractor The City reserves the right to reject any and all bids, to waive informalities and technicalities and to enter into such contract as it shall deem for the best interest of the City.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents