Similar Projects
Scheduled and Emergency Bridge Deck Repairs and Related Work at Various Locations
Bidding
Less than $923,540 est. value

Wearing Surface Repairs and Related Work (Including Painting) BR No. W-44-098 (Steel) Interstate 190 (NB and SB) Over the P and W Railroad
Bidding
Less than $3,695,290 est. value
Worcester, MA

Scheduled and Emergency Drawbridge Operation, Maintenance and Repairs at Various Locations
Post-Bid
Less than $5,090,000 est. value

Scheduled and Emergency Bridge Steel Beam Repairs (including Painting) at Various Locations Excluding the Islands
Results
Less than $1,539,000 est. value

Replacement of Fisher Street Bridge over Assabet River
Results
$1,100,000 est. value
Westborough, MA 01581

Queen Lake Road Bridge Rehabilitation Project
Bidding
$500,000 est. value
Phillipston, MA 01331

Bridge Structural Repairs and Related Work (Including Painting) along Interstate 495
Results
Less than $2,765,000 est. value

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Bidding
$1,847,645 est. value

Scheduled and Emergency Bridge Deck Repairs at Various Locations on Interstate 90
Results
Less than $2,351,000 est. value

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $1,489,000 est. value

Scheduled and Emergency Structural Repairs at Various Locations
New Construction
Bidding
$1,459,640 est. value

Bridge Structure Repairs (Including Painting) at Various Locations
Results
Less than $960,000 est. value

Scheduled and Emergency Bridge Structural Repairs at Various Locations
Results
Less than $1,267,525 est. value

Scheduled and Emergency Bridge Deck Repairs and Related Work at Various Locations
Results
Less than $2,247,400 est. value

Last Updated 09/23/2020 10:27 AM
Project Title

Bridge Superstructure Replacement and Related Work BR No A-17-046 (Steel) I-90 Interchange 10 Over Route 12 (Southbridge Street)

Physical Address View project details and contacts
City, State (County) Auburn, MA 01501   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,276,919
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $60,000.00","100." "1.000","Ls","Selective Clearing And Grubbing","102.01" "80.000","Hr","Control Of Invasive Plants Existing On Site","102.31" "1.000","Ls","Invasive Plant Management Strategy","102.33" "16.000","Ea","Individual Tree Protection","102.51" "300.000","Ft","Temporary Tree Protection Fence","102.52" "1.000","Ls","Demolition Of Superstructure Of Bridge No. a-17-046","114.1" "4300.000","Cy","Earth Excavation","120." "165.000","Cy","Reinforced Concrete Excavation","127.1" "1010.000","Cy","Bridge Excavation","140." "30.000","Cy","Test Pit For Exploration","141.1" "70.000","Cy","Class b Trench Excavation","142." "70.000","Cy","Class b Rock Excavation","144." "1.000","Ea","Drainage Structure Abandoned","145." "13.000","Ea","Drainage Structure Removed","146." "990.000","Cy","Ordinary Borrow","150." "780.000","Cy","Special Borrow","150.1" "1040.000","Cy","Gravel Borrow","151." "350.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "7.000","Cy","Controlled Density Fill - Excavatable","153." "10.000","Cy","Controlled Density Fill - Non-Excavatable","153.1" "60.000","Ton","Crushed Stone","156." "4200.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "17.000","Ea","Catch Basin - Deep Sump","201.4" "3.000","Ea","Manhole","202." "19.000","Ea","Drainage Structure Adjusted","220." "2.000","Ea","Drainage Structure Change In Type","220.3" "3.000","Ea","Frame And Cover","221." "16.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "1.000","Ea","Frame And Grate - Massdot Drop Inlet","222.2" "14.000","Ea","Large Hook Lock Bar Grate – Furnished And Installed","222.4" "13.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "21.000","Cy","Removal Of Drainage Structure Sediment","227.3" "600.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "12.000","Sf","Masonry Plug","227.4" "225.000","Ft","12 Inch Corrugated Metal Pipe 16 Gage","230.112" "100.000","Ft","10 Inch Ductile Iron Pipe","238.10" "100.000","Ft","12 Inch Ductile Iron Pipe","238.12" "80.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "110.000","Ft","15 Inch Reinforced Concrete Pipe","241.15" "150.000","Ft","18 Inch Reinforced Concrete Pipe","241.18" "4.000","Ea","12 Inch Reinforced Concrete Pipe Flared End","242.12" "3.000","Ea","15 Inch Reinforced Concrete Pipe Flared End","242.15" "2.000","Ea","18 Inch Reinforced Concrete Pipe Flared End","242.18" "2.000","Ea","12 Inch Corrugated Plastic Pipe Flared End","252.112" "55.000","Sy","Stone For Pipe Ends","258." "150.000","Ft","12 Inch Perforated Corrugated Metal Pipe-16 Gage (Subdrain)","261.12" "1.000","Ls","Pumping Drainage Flow Lump-Sum","275." "380.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "23010.000","Sy","Pavement Standard Milling","415.1" "520.000","Sy","High Early Strength Cement Concrete Base Course","431." "3000.000","Lb","Calcium Chloride For Roadway Dust Control","440." "30.000","Mgl","Water For Roadway Dust Control","443." "1510.000","Ton","Superpave Surface Course – 9.5 Polymer (Ssc – 9.5 - p)","450.221" "3400.000","Ton","Superpave Intermediate Course - 19.0 Polymer (Sic - 19.0 - p)","450.321" "850.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "86.000","Ton","Superpave Bridge Surface Course - 9.5 (Ssc-b - 9.5)","450.60" "111.000","Ton","Superpave Bridge Protective Course - 9.5 (Spc-b - 9.5)","450.70" "6.000","Ton","Hma For Patching","451." "1175.000","Gal","Asphalt Emulsion For Tack Coat","452." "4010.000","Ft","Hma Joint Sealant","453." "190.000","Ton","Asphalt Mixtures For Temporary Work","472." "570.000","Ft","Sawcutting Asphalt Pavement","482.3" "4060.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "4.000","Ea","Granite Curb Type Va4 - Splayed End","504.2" "115.000","Ft","Granite Curb Type Va5 - Straight","505." "130.000","Ft","Granite Curb Type Vb - Straight","506." "2350.000","Ft","Granite Edging Type Sb - Straight","511.1" "60.000","Ft","Granite Edging Type Sb (Radius 10 Feet Or Less)","512.1" "2760.000","Ft","Curb Removed And Discarded","594." "2160.000","Ft","Edging Removed And Discarded","597." "658.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "554.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "4.000","Ea","Trailing Anchorage","627.1" "4.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "1.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "1.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "1.000","Ea","Transition To Rigid Barrier (Single Faced)","628.22" "2.000","Ea","Transition To Rigid Barrier (Double Faced)","628.23" "4.000","Ea","Transition To Bridge Rail","628.24" "1.000","Ea","Transition To Thrie Beam","628.25" "2.000","Ea","Impact Attenuator For Median, Capable Of Redirection","628.34" "795.000","Ft","Precast Concrete Median Barrier - Double Faced","629.2" "400.000","Ft","Asymmetrical Concrete Median Barrier","629.31" "50.000","Ft","Cast-In-Place Concrete Median Barrier - Double Faced","629.4" "3290.000","Ft","Highway Guard Removed And Discarded","630.2" "925.000","Ft","Temporary Fence","657." "40.000","Ea","Silt Sack","697.1" "10.000","Ton","Hot Mix Asphalt Walk Surface","702." "36.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "655.000","Cy","Loam Borrow","751." "80.000","Hr","Wetland Specialist","755.7" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "4420.000","Sy","Seeding","765." "490.000","Sy","Seeding Steep Slope Mix","765.15" "40.000","Lb","Seed For Erosion Control","765.2" "120.000","Sy","Seeding - Basin Mix","765.31" "520.000","Sy","Wetland Mix Part Shade","765.555" "2430.000","Ft","Sediment Control Barrier","767.121" "490.000","Sy","Matting For Erosion Control","767.9" "1865.130","Ft","Pavement Milling Mulch Under Guard Rail","769." "35.000","Ft","2 Inch Electrical Conduit Type Nm - Plastic (Ul)","804.2" "1460.000","Ft","3 Inch Electrical Conduit Type Nm - Plastic -(Ul)","804.3" "200.000","Ft","3 Inch Electrical Conduit Type Rm - Galvanized Steel","806.3" "11.000","Ea","Electric Handhole - Sd2.024","811.24" "1.000","Ea","Electric Manhole Adjusted","811.36" "7.000","Ea","Electric Handhole Adjusted","811.37" "5.000","Ea","Electric Handhole Removed And Stacked","811.39" "1.000","Ea","Light Standard Foundation Precast","812.09" "8.000","Ea","Light Standard Foundation Sd3.013","812.13" "8000.000","Ft","Wire Type 8 No. 4 Direct Burial","813.43" "1900.000","Ft","Wire Type 10 - #6 Grounding And Bonding","813.522" "11.000","Ea","Ground Rod 10 Feet Long","813.72" "12.000","Ea","Highway Lighting Pole (Anchor Base) 8 Foot Bracket","821.12" "10.000","Ea","Highway Lighting Luminaire 10k Lumen Led","823.24" "2.000","Ea","Highway Lighting Luminaire 19k Lumen Led","823.25" "1.000","Ea","Highway Lighting Pole And Luminaire Removed And Reset","823.70" "11.000","Ea","Highway Lighting Pole And Luminaire Removed And Stacked","823.71" "120.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "11.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "220.000","Hr","Roadway Flagger","850.41" "730.000","Day","Traffic Cones For Traffic Management","851.1" "1753.000","Sf","Safety Signing For Traffic Management","852." "10.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "5025.000","Ft","Temporary Barrier Removed And Reset","853.211" "4050.000","Ft","Temporary Barrier (Tl-3)","853.23" "2075.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "730.000","Day","Truck Mounted Attenuator","853.403" "3.000","Ea","Temporary Impact Attenuator For Shoulder, Capable Of Redirection","853.42" "2.000","Ea","Temporary Impact Attenuator For Median, Incapable Of Redirection","853.43" "11.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "730.000","Day","Temporary Illumination For Work Zone","853.8" "26900.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "4310.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "6486.000","Sf","Pavement Marking Removal","854.1" "210.000","Day","Arrow Board","856." "730.000","Day","Portable Changeable Message Sign","856.12" "6630.000","Day","Reflectorized Drum","859." "6630.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "6542.000","Ft","6 Inch Reflectorized White Line (Polyurea) (Recessed)","866.206" "570.000","Ft","12 Inch Reflectorized White Line (Polyurea) (Recessed)","866.212" "5508.000","Ft","6 Inch Reflectorized Yellow Line (Polyurea) (Recessed)","867.206" "12.000","Ea","Traffic Sign Removed And Reset","874.2" "19.000","Ea","Traffic Sign Removed And Discarded","874.41" "550.000","Sy","Excavation Support System","953.3" "20.000","Gal","Corrosion Inhibiting Impregnation Coating","964.011" "3400.000","Sf","Elastomeric Protective Coating","964.21" "585.000","Sy","Special Slope Paving Under Bridge - Cement Concrete","987.3" "2.500","Cy","Concrete Repair Type a","989.31" "4.000","Cy","Concrete Repair Type b","989.32" "1.000","Ls","Temporary Protective Shielding Bridge No. a-17-046","994.01" "1.000","Ls","Bridge Superstructure, Bridge No.a-17-046","995." "106.000","Sy","Mechanically Stabilized Earth Wall","996.31" "30.000","Day","Mse Wall Manufacturer's Representative","996.33"

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents