Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

TSG-FY2023 - Signalization
Infrastructure
Sub-Bidding
$1,020,000 CJ est. value
Lisbon, OH 44432

Electrical Panel Upgrade at Lakeview
Renovation
Sub-Bidding
$815,000 CJ est. value
Cleveland, OH 44113

DOP - 2021 - K-Switch for Aclara Electric Meters
Alteration
Post-Bid
Columbus, OH

MCC Replacement Delaware
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Delaware, OH 43015

Edgewood Middle School Stage Lighting Improvements
Results
Less than $85,000 est. value
Trenton, OH 45067

Solar Energy Development Project
Results
Berea, OH

Traffic Lights 2022
Term Contract
Sub-Bidding
Bucyrus, OH 44820

Electrical Maintenance and Repair Services for Campus
Alteration
Post-Bid
Cincinnati, OH 45214

Y1da--Construction | Install Car Charging Stations Project 539-21-203
Results
$5,000,000 to $10,000,000 est. value
Cincinnati, OH 45220

Site Lighting Dr. W. J. Shepard Apartments
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Bellaire, OH 43906

Distribution Transformers CPP TR 2021
Alteration
Post-Bid
Cleveland, OH

Electrical Repair and Maintenance Services
Results
Cleveland, OH

Cuyahoga County Airport Street Lighting Replacement
Infrastructure
Sub-Bidding
$109,135 CJ est. value
Richmond Heights, OH 44143

Last Updated 11/29/2022 09:10 AM
Project Title

Water Treatment Plant and Yankee Pump Station Generator Project

Physical Address View project details and contacts
City, State (County) Middletown, OH 45044   (Butler County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,038,100 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 29, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Water Treatment Plant and Yankee Pump Station Generator Project Differing Site Conditions. During the progress of the Work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the Contract Documents or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the Work provided for in the Contract Documents, are encountered at the site, the Contractor shall notify the Engineer of the specific differing conditions before they are disturbed or the affected Work is performed.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents