Similar Projects
Westchester County ATCT HVAC Replacement
Term Contract
Design
$250,000 to $500,000 est. value
White Plains, NY 10604

Kitchen Exhaust Hood Cleaning and Maintenance Service
Term Contract
Design
Montrose, Wappingers Falls, NY 12590

HVAC Services
Term Contract
Sub-Bidding
Dobbs Ferry, NY 10522

Replace HVAC Units, Buildings 503 and 501
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Cortlandt Manor, NY 10567

Hvac Equipment Maintenance And Related Services
Term Contract
Post-Bid

Gas Conversion/HVAC Project for Roosevelt High School
Alteration
Post-Bid
Yonkers, NY 10710

Upgrade of HVAC Systems for Town Center
Alteration
Results
Mamaroneck, NY 10543

Provide Wastewater Treatment Plant Improvements, Building 92 - HVAC
Alteration
Results
$1,000,000 to $2,000,000 est. value
Bedford Hills, NY 10507

Trade Labor for Village of Irvington Projects - HVAC
Renovation
Sub-Bidding
$400,000 CJ est. value
Irvington, NY 10533

H966--USP Compliant Pharmacy Certification/Lab BSC/Fume Hood Cert Base Year
Term Contract
Post-Bid
Castle Point, Montrose, NY 10548

Steam System Upgrades Phase II at Michaelian Office Building
Alteration
Results
$1,700,000 to $1,900,000 est. value
White Plains, NY 10601

Air Conditioners
Alteration
Post-Bid
Yonkers, NY

Heathcote School and Scarsdale MS Capital Improvements
Alteration
Results
$1,550,395 est. value
Scarsdale, NY 10583

Heat Pump System Service and Maintenance
Alteration
Post-Bid
Yonkers, NY

Heating Service and Maintenance
Alteration
Results
Yonkers, NY

Last Updated 04/12/2023 02:57 PM
Project Title

Ultra Violet Replacements at Eastview Middle School - Contract H - HVAC Construction Work

Physical Address View project details and contacts
City, State (County) White Plains, NY 10601   (Westchester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,086,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SEALED PROPOSALS for: WHITE PLAINS CITY SCHOOL DISTRICT UV REPLACEMENTS AT EASTVIEW MIDDLE SCHOOL SED Control No. 66-22-00-01-0-003-017 CONTRACT H - HVAC CONSTRUCTION WORK CONTRACT E - ELECTRICAL CONSTRUCTION WORK will be received. In the event that on this date the White Plains City School District is closed to all students and all staff or has an early dismissal due to weather or any other emergency that closes all schools and offices for all students and all staff prior to 2:30 PM. Bidder's deposit will be refunded if the set is returned to REV in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. Non-bidders shall receive partial reimbursement, in an amount equal to the amount of the deposit, less the actual cost of reproduction of the documents if the set is returned in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Please note REVplans melville.h2mplanroom.com is the designated location and means for distributing and obtaining all bid package information. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not contain addenda that may have been issued. All bid addenda will be transmitted to registered plan holders via email and will be available at melville.h2mplanroom.com Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. Bids must be made on the standard proposal form in the manner designated therein and as required by the specifications that must be enclosed in sealed opaque envelopes bearing the name of the job and name and address of the bidder on the outside, addressed to: "PURCHASING AGENT, White Plains City School District", clearly marked on the outside, "UV REPLACEMENTS AT EASTVIEW MIDDLE SCHOOL, SED NO. 66-22-00-01-0-003-017". The School District is not responsible for bids opened prior to the bid opening if bid number and opening date do not appear on the envelope. Bids opened prior to date and time indicated are invalid. The bidder assumes the risk of any delay in the mail, or in the handling of the mail by employees of the White Plains City School District, as well as of improper hand delivery. Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the "White Plains City School District", in an amount equal to ten percent (10%) of the total amount of the bid, as a commitment by the bidder that, if its bid is accepted, it will enter into a contract to perform the work and will execute such further security as may be required for the faithful performance of the contract. Certification of bonding company is required for this bid, see Instructions for Bidders. Each bidder shall agree to hold his/her bid price for forty-five (45) days after the formal bid opening. Potential bidders are asked to contact Fred Camilli, Lead Project Executive / Consultant, to schedule a pre- bid walk-thru: Frederick Camilli Lead Project Executive/Consultant Field Office - Eastview Middle School Triton Construction Company 350 Main Street - Room 233 | White Plains, NY 10601 office 212.388.5700 | mobile 516.252.7525 e-mail: fcamilli@tritonconstruction.net Bidders are asked to follow all CD C guidelines during the pre-bid walk thru. Although the pre-bid meeting and walk-thru are not mandatory, it is highly recommended that all potential bidders make arrangements to visit the site. It is the Board's intention to award the contract to the lowest qualified bidder in compliance with the specifications providing the required security who can meet the experience, technical and budget requirements. The Board reserves the right to reject any or all bids, waive any informality and to accept such bid which, in the opinion of the Board, is in the best interests of the School District.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents