Similar Projects
Kroger #118-01 - Site Work Only
New Construction
Design
Spring, TX 77388

Excavation and/or Paving for La Terra Phase One
Infrastructure
Bidding
TX

Clearing and Grubbing to serve Arabella on the Prairie Phase 1 Detention
Infrastructure
Bidding
TX

Dragline Work
Post-Bid
Bay City, TX

Energized & De-Energized Power Line Construction, & Storm Restoration, Including Overhead & Underground Installation
Renovation
Post-Bid
Navasota, TX 77868

Trinity Strand Trail - Phase Two - Site Development
Results
$5,498,971 est. value
Dallas, TX

Grading Improvements for Highbridge, Phase 4
Results
Dallas, TX 75206

Basketball Performance Facility
Construction
Nacogdoches, TX 75962

Village 121 Site Work
New Construction
Construction
Plano, TX 75024

Clearing and Grubbing Phase 2 to Serve Sorella Development
Infrastructure
Bidding
TX

Rock Road Construction & Parking Lot Expansion
Addition
Post-Bid
Beaumont, TX 77708

Phase 4A/4C - Grading Package for Bridgewater
Results
TX

The Watercress Amenity Center & Site Development
New Construction
Construction
Haslet, TX 76052

Clearing and Mass Grading Improvements for Union Park Phase 9
Infrastructure
Bidding
Little Elm, TX

Joines Road Deep Well No. 1 and 2
New Construction
Post-Bid
San Benito, TX 78586

Reported 03/15/2022 12:00 AM
Project Title

Drilling Services at El Paso, TX

Physical Address View project details and contacts
City, State (County) El Paso, TX   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall perform ten (10) CPTs to a depth of one-hundred (100’) feet at specific locations as indicated by USBP/CBP representative. The contractor shall deploy magnetometer based sensors, electrical resistivity sensors or a probe based camera at the direction of USBP/CBP representative to record data as a function of depth. All recorded data along with locations of each test to sub-centimeter accuracy GPS coordinates shall be delivered at completion of project. If the geology is not suited to CPT, another exploratory geophysical technique may be proposed such as traditional geotechnical borings with sampling/data logging

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents