Similar Projects
Last Updated | 05/25/2023 10:43 AM |
Project Title | Bike Path/Trail |
Physical Address | View project details and contacts |
City, State (County) | Port Saint Lucie, FL 34952 (Saint Lucie County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $10,631,541 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | County : St Lucie Road Name: Savannas Preserve State Park Gap Limits: Midpoint Project(s): 43999925201(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 607 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: Special Start Date: N/A Aquis/Flexible Start Time: 30 The Improvements under this Contract consist of a shared-used path, which include but are not limited to, monitor existing structures (inspection, settlement), concrete (removal, sidewalk), signing, pavement markings (detectable warnings), and sod along Savannas SUNTRAIL from Walton Road to Lennard Road for 6.559 miles in St. Lucie County Contractor needs to be pre-qualified. A Contract / Performance bond is required for this project. The limits of coverage shall not be less than $1,000,000 for each occurrence and not less than a $5,000,000 annual general aggregate, inclusive of amounts provided by an umbrella or excess policy. The limits of coverage described herein shall apply fully to the work or operations performed under the Contract, and may not be shared with or diminished by claims unrelated to the contract. The policy/ies and coverage described herein may be subject to a deductible. Pay all deductibles as required by the policy. No policy/ies or coverage described herein may contain or be subject to a Retention or a Self-Insured Retention. Workers Compensation Insurance Prevention, Control, and Abatement of Erosion and Water Pollution : Please Read From the Specs Package Section 104. FDOT - Call Order: 002 Bike Path/Trail |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |