Similar Projects
California Widening - City of Port Saint Lucie
Infrastructure
Conception
$3,700,000 est. value
Port Saint Lucie, FL 34986

Bayshore & Lakehurst Signalization - City of Port St. Lucie
Infrastructure
Conception
$800,000 CJ est. value
Port Saint Lucie, FL 34983

500 Stadium Business Center at SLW
New Construction, Infrastructure - 35,056 SF
Design
$7,500,000 CJ est. value
Port Saint Lucie, FL 34986

500 Stadium Business Center at SLW
New Construction, Infrastructure - 35,056 SF
Design
$7,500,000 CJ est. value
Port Saint Lucie, FL 34986

McCarty Ranch Extension Water Quality Restoration Project - Areas 5 and 6
Infrastructure
Bidding
$4,674,900 CJ est. value
Port St Lucie, FL 34953

Design Criteria Package for the Police Training Facility - City of St. Lucie
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Port St Lucie, FL 34953

Western Floridan Water Well F-19 Construction Project
New Construction, Infrastructure
Post-Bid
$1,900,000 CJ est. value
Port St Lucie, FL 34953

Construction of the Northport 24" Force Main on Glades Cutoff Road
Infrastructure
Results
$3,622,820 est. value
FL

Import Drive Sidewalk Construction Project - Phase I
Infrastructure
Results
$644,923 est. value
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Wylder Communities / Port Saint Lucie - Master Plan
New Construction, Infrastructure
Construction
$200,000,000 CJ est. value
Fort Pierce, FL 34981

Speedway #1551 / Port Saint Lucie
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Port St Lucie, FL 34953

Speedway #1551 / Port Saint Lucie
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Port St Lucie, FL 34953

Glenwood Rehabilitation - City of Port Saint Lucie
Infrastructure
Conception
$500,000 CJ est. value
Port Saint Lucie, FL 34984

Greco Lane Multi-Residential Development / Port St Lucie
New Construction, Infrastructure - 64,063 SF
Design
$13,400,000 CJ est. value
Port St Lucie, FL 34953

Last Updated 05/25/2023 10:43 AM
Project Title

Bike Path/Trail

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL 34952   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $10,631,541 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : St Lucie Road Name: Savannas Preserve State Park Gap Limits: Midpoint Project(s): 43999925201(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 607 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: Special Start Date: N/A Aquis/Flexible Start Time: 30 The Improvements under this Contract consist of a shared-used path, which include but are not limited to, monitor existing structures (inspection, settlement), concrete (removal, sidewalk), signing, pavement markings (detectable warnings), and sod along Savannas SUNTRAIL from Walton Road to Lennard Road for 6.559 miles in St. Lucie County Contractor needs to be pre-qualified. A Contract / Performance bond is required for this project. The limits of coverage shall not be less than $1,000,000 for each occurrence and not less than a $5,000,000 annual general aggregate, inclusive of amounts provided by an umbrella or excess policy. The limits of coverage described herein shall apply fully to the work or operations performed under the Contract, and may not be shared with or diminished by claims unrelated to the contract. The policy/ies and coverage described herein may be subject to a deductible. Pay all deductibles as required by the policy. No policy/ies or coverage described herein may contain or be subject to a Retention or a Self-Insured Retention. Workers Compensation Insurance Prevention, Control, and Abatement of Erosion and Water Pollution : Please Read From the Specs Package Section 104. FDOT - Call Order: 002 Bike Path/Trail

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents