Similar Projects
Dunklee Pond Dam Removal
Demolition
Results
$224,000 est. value
Rutland, VT 05701

Miles Pond Dam Improvements
Results
$120,000 est. value
Concord, VT 05824

Stevens Branch Dam Removal Study and Design
New Construction, Term Contract
Post-Bid
Montpelier, VT 05602

Laplatte River Lamprey Barrier Project
Infrastructure
Results
Shelburne, VT 05482

Fort Hill Bridge Removal, Stream Restoration and Route 15 Wildlife Passage Project
Construction
Less than $141,902 est. value
Williston, VT 05495

Reported 03/31/2022 12:00 AM
Project Title

Pelletier Dam Removal

Physical Address View project details and contacts
City, State (County) Castleton, VT 05735   (Rutland County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents