Similar Projects
2021 Stormwater and Street Improvements
Bidding
McFarland, WI

2021 Road Maintenance
Bidding
$280,000 to $340,000 est. value
Middleton, WI

Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

East Side Interceptor and MMSD PS 17 Force Main Relief Phase I
Results
Less than $8,800,000 est. value
Verona, WI

Road Work
Bidding
Verona, WI

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

Crack Routing and Sealing
Results
Madison, WI 53703

Chip Seal
Bidding
WI

Village of Dane Southeast Public Works Loop
Post-Bid
Dane, WI

CIPP Rehab of Sanitary Sewers
Results
$1,141,590 est. value
Madison, WI 53703

New Glarus - Verona, South County Line - Gehin Street
Bidding
New Glarus, Verona, WI

Sewer Cleaning and Multi Sensor Inspection for the Pumping Station 16 Force Main
Post-Bid
Madison, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Last Updated 10/16/2020 07:16 AM
Project Title

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh

Physical Address View project details and contacts
City, State (County) Fitchburg, Madison, WI 53719   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall construct approximately 4,200 lineal feet of sanitary interceptor in sizes between 36 and 48-inch along the Military Ridge Trail and Cannonball Path in the Cities of Fitchburg and Madison. The project will install 12 new precast manholes, reconstruct 3 manholes, modify 2 manholes, and abandon the existing interceptor after reconnecting local flows. Miscellaneous smaller sizes of sanitary sewer are included in the project. Access for the project will be along the path which will be restored and repaved as part of the project. Other items included in the project are a relay of sections of forcemain, watermain, and storm sewer along with dewatering, tree removals, native restoration, and wetland restoration

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents