Similar Projects
Water System Improvements Ph 11 - Zone Meter & River Crossing Installation Re-Bid
Post-Bid
Irvine, KY

Miscellaneous Water System Improvements - Rebid
Post-Bid
Paintsville, KY

Marsh Creek Road Waterline Replacement
Results
Less than $1,100,000 est. value
Whitley City, KY 42653

Chiller and Water Replacement at Westport Middle School
Results
Louisville, KY 40222

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

Chiller and Water Replacement at Rutherford Elementary School
Post-Bid
Louisville, KY 40214

Montpellier Drive Water and Sewer Rehabilitation
Results
Fort Knox, KY 40121

Third Street Water Line Relocation
Post-Bid
Maysville, KY

Waterline Extension
Results
Hindman, KY 41822

Bloomfield Road S.R. 55 Waterline Replacements - Contract 23
Post-Bid
Taylorsville, KY 40071

Sagebrush Lane and Shadyside Drive Water Main Replacement
Results
Less than $468,000 est. value
Erlanger, KY 41018

Emergency Raw Water Line
Post-Bid
Salyersville, KY

Robin Lane Water Main Replacement
Results
Villa Hills, KY 41017

Springfield Road Looped Connection Water System Improvements
Post-Bid
Bardstown, KY

Topsoil Restoration
Results
Aberdeen, KY

Reported 06/15/2022 12:00 AM
Project Title

KY 3155 Leitchfield By-Pass Water Main Relocation - Contract No. 8

Physical Address View project details and contacts
City, State (County) Leitchfield, KY 42754   (Grayson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $461,925 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The program of work consists of approximately 2,625 L.F. of 4-inch water main, 1,225 L.F. of 8-inch water main and 635 LF of 12-inch water main including all related appurtenances for the Contract No. 8 KY 3155 Leitchfield By-Pass Water Main Relocation.The Contract Time allotted for the completion of this Contract is One Hundred and Twenty (120) consecutive calendar days..A certified check or Bid Bond payable to the Grayson County Water District in the amount of five (5) percent of the Bid shall accompany the Bid.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents