Similar Projects
Repplier Park Camera Installation Project
Renovation
Design
$200,000 CJ est. value
Banning, CA 92220

HSIP 9-1 - Palm Drive Pedestrian Improvement Project
Infrastructure
Bidding
$295,000 CJ est. value
Desert Hot Springs, CA 92240

Emergency Operations Center Integrated Audio Video Systems Upgrade
Renovation
Sub-Bidding
$600,000 CJ est. value
Corona, CA 92880

Fire Station 66 Electrical Upgrades
Renovation
Sub-Bidding
$6,593,458 CJ est. value
Beaumont, CA 92223

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Design and Construction of a Monitor Steel Frame Barn Building at the George A. Ingalls Event Center
New Construction, Term Contract, Alteration
Post-Bid
Norco, CA

Permanent Emergency Generator
Alteration
Results
$180,000 est. value
Riverside, CA 92519

Demuth Community Center Egress And Gym Improvements
Renovation, Alteration
Results
$750,000 to $950,000 est. value
Palm Springs, CA 92264

Generator Installation
Renovation
Construction
$2,028,300 CJ est. value
Hemet, CA 92543

Corona High School Theatre Lighting System Project
Renovation
Sub-Bidding
$110,000 CJ est. value
Corona, CA 92882

Rancho Mirage Library and Observatory Community Room Lighting Project
Renovation
Post-Bid
$300,000 CJ est. value
Rancho Mirage, CA 92270

Shumway Ranch Site Improvements Project (Electrical)
Alteration
Results
$12,980 est. value
Indio, Mountain Center, CA 92201

RFP - Riverside Transmission Reliability (RTRP) Consultant Services
Term Contract
Post-Bid
Riverside, CA 92522

City Council Chambers Renovations
Alteration
Results
Palm Desert, CA 92260

67-12 KV Oil-Filled Transformer University T4 and LA Colina T2
Term Contract
Post-Bid
Riverside, CA 92522

Last Updated 03/02/2023 01:06 PM
Project Title

San Jacinto Avenue and Shaver Street Traffic Signal Installation and Signal Interconnectivity Between Seventh Street and Esplanade Avenue

Physical Address View project details and contacts
City, State (County) San Jacinto, CA 92583   (Riverside County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $789,446 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the installation of a traffic signal at Shaver Street and San Jacinto Avenue, as well as street improvements and the installation of pedestrian pathways to accommodate the new traffic signal. Included in this project are traffic signal modifications to three traffic signals along San Jacinto Avenue. Also included are street improvements at the intersection of San Jacinto Avenue and Seventh Street. Q&A Deadline 01/09/2023 5:00 PM (PST) Pre-Bid Meeting No Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,000.00 for each and every calendar day of delay Start/Delivery Date March 13, 2023 Project Duration 90 Working Days Type of Award Lump Sum Project Type Bid Response Types Line Items

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents