Similar Projects
System-Wide Improvements Project
Infrastructure
Bidding
$400,000 CJ est. value
Lead, SD 57754

Concrete
Alteration
Post-Bid
Rosebud, SD

Concrete Foundation
Alteration
Post-Bid
Rosebud, SD

Concrete Maintenance
Results
$1,000,000 est. value
Brookings, SD

Rehabilitation of Runway 7-25
Infrastructure
Results
$6,510,854 CJ est. value
Pierre, SD 57501

B-21: Washrack and Maintenance Hangar
New Construction, Infrastructure - 56,811 SF
Post-Bid
$70,000,000 CJ est. value
Ellsworth AFB, SD 57706

2021 Street Maintenance Concrete Repair II
Alteration
Results
$223,564 est. value
Aberdeen, SD

2022-2023 Concrete Products
Term Contract
Post-Bid
SD

Campus Wide Concrete Repairs 2021
Alteration
Results
$100,000 to $250,000 est. value
Pierre, SD

Curb Boxes & Curb Box Lids
Term Contract
Post-Bid
SD

Highway 52 Bike Concrete Approach Crossing
Alteration
Results
Yankton, SD 57078

Reinforced Concrete Culverts
Infrastructure, Alteration
Post-Bid
SD

Concrete and Drainage Repair
Infrastructure, Alteration
Results
Rapid City, SD 57702

Concrete
Term Contract, Alteration
Post-Bid
Sioux Falls, SD

Concrete Repairs for 2022 Overlay - Phase 1
Infrastructure
Results
$580,000 est. value
Sioux Falls, SD

Last Updated 01/06/2023 07:15 AM
Project Title

Rushmore Area Reconstruction - Phase 2

Physical Address View project details and contacts
City, State (County) Brandon, SD 57005   (Minnehaha County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,143,681 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

2,100 LF of 8" PVC Water Main 800 LF of 12" PVC Water Main 2,800 LF of 8" PVC Sanitary Sewer 140 LF of 20" Steel Casing (Trenchless) 2,300 LF of 15" to 36" RCP Storm Sewer 12,000 Ton of Aggregate Base Course 3,000 Ton of Asphalt Concrete Composite Along with associated grading, seeding, and site restoration.Water/Wastewater Infrastructure, Utility Street Construction and Excavation, Stormwater Improvements, Street/Roadway Reconstruction. Est. Completion Date:Nov. 17, 2023 Complete digital project bidding documents are available for $20.00

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents