Similar Projects
Supply and Deliver Dry Polymer 2023-2024
Term Contract
Sub-Bidding
Sayreville, NJ 08872

Solid Waste and Recyclable Collection Services
Term Contract
Sub-Bidding
East Brunswick, NJ 08816

Athletic Field Maintenance
Term Contract
Post-Bid
East Brunswick, NJ 08816

Sewer Pump Rentals
Term Contract
Post-Bid
Edison, NJ 08817

Property Maintenance Services for Code Enforcement Department
Term Contract
Results
Piscataway, NJ 08854

2023-2024 - Shoveling/Blowing Services
Term Contract
Sub-Bidding
$3,678 CJ est. value
Piscataway, NJ 08854

Electrical Contractor - Time and Material Rebid
Term Contract
Post-Bid
Old Bridge, NJ 08857

2024-2025 Fire Suppression Systems Testing and Maintenance
Term Contract
Sub-Bidding
Piscataway, NJ 08854

Fire Burglar Alarm Monitoring and Inspection - Old Bridge Township Locations Rebid
Term Contract
Post-Bid
Old Bridge, NJ 08857

Operation and Management Services for the Tamarack Golf
Term Contract
Sub-Bidding
Middlesex, NJ 08846

Annual Sewer System Emergency Service Contract
Term Contract
Post-Bid
Carteret, NJ 07008

Snow Removal-Twp Walkways
Term Contract
Sub-Bidding
Old Bridge, NJ 08857

Building Materials
Term Contract
Post-Bid
Edison, NJ 08817

Snow Removal-Twp Roadways
Term Contract
Sub-Bidding
Old Bridge, NJ 08857

Boiler Service and Maintenance
Term Contract
Post-Bid
Edison, NJ 08817

Last Updated 10/02/2023 12:08 PM
Project Title

Removal And Disposal of Mercury Catalyzed Polyurethane Floor at the Club at Woodbridge

Physical Address View project details and contacts
City, State (County) Woodbridge, NJ 07095   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $490,880 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 2, 2023, project was awarded, start date is Mid of November and will be completed by end of this year** Reference Number 0000326100 Utilizing full containment engineering controls, the Contractor shall remove and dispose of approximately 12,272 square feet of mercury catalyzed polyurethane floor and underlying four (4) to six (6) inches of asphalt from the Track/Basketball area of The Club at Woodbridge. The Contractor shall remove and dispose the approximately 10,000 square feet of overlying wood floor systems, associated plywood and polyethylene vapor barrier glued to the mercury catalyzed polyurethane floor. Approximately 5,000 square feet of wood flooring is double layered over plywood. The Contractor shall remove and dispose of drywall from the east wall to a minimum height of one (1) foot, to facilitate the removal of flooring beneath the wall. Where the floor is raised in the corners, the Contractor shall remove and dispose of the raised curbs and underlying asphalt material. Delivery Point 585 Main Street, Woodbridge NJ 07095 Question Acceptance Deadline 08/10/2023 04:00 PM EDT Questions are submitted online Yes

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents