Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Electrical Services - Biosolids Management Facility
Term Contract
Sub-Bidding
Eugene, OR 97402

Electrical Services
Renovation
Sub-Bidding
$200,000 CJ est. value
Eugene, OR 97402

Hills Creek Dam Electrical Reliability Upgrades
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Oakridge, OR 97463

East Science MV Electrical Loop Phase 1
Alteration
Post-Bid
$1,100,000 est. value
Eugene, OR 97403

Gateway and Franklin Emx LED Lighting Upgrade
Alteration
Results
Eugene, OR

Two 1500 or 2000 KVA 3 Phase Substation Regulators
Alteration
Results
Eugene, OR

Switchgear at IP Powerhouse 4
Alteration
Post-Bid
Eugene, Springfield, OR 97402

OR99: Urban Upgrade (Cottage Grove) on Goshen-Divide Highway (Rt. No. OR99) in Cottage Grove
Infrastructure, Alteration
Results
$2,000,000 to $5,000,000 est. value
OR

Provision of Electrical Components
Alteration
Post-Bid
Eugene, OR 97402

Walton MV Service and Switch Installation
Alteration
Results
Eugene, OR

Station Class Power Transformers
Alteration
Post-Bid
Eugene, OR

UO Baker Center Roof Replacement PH2 Area F
New Construction, Demolition, Alteration
Results

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Automatic Transfer Switch (ATS) Upgrades - Streisinger and UHCTC
Alteration
Results
$200,000 est. value
Eugene, OR 97401

Last Updated 09/02/2022 09:31 AM
Project Title

Onyx Laboratory Exhaust Upgrades

Physical Address View project details and contacts
City, State (County) Eugene, OR 97403   (Lane County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 02, 2022, project is on hold. No definite date for the rebid. The Project is generally described as the demolition of individual fume hood exhaust fans and general exhaust fans, and replacement with three chemical exhaust fans connected to a common exhaust header, along with associated structural supports. All bidders must comply with requirements of the prevailing wage law in ORS 279C.800 through ORS 279C.870. All bidders must be registered with the Construction Contractors Board at the time of bid submission. No bid will be considered unless fully completed in the manner provided in the Instructions to Bidders upon the Bid Form provided and accompanied by Bid Security. UO encourages bids from Minority, Women, and Emerging Small Businesses.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents