Similar Projects
Last Updated | 12/01/2022 04:16 PM |
Project Title | Test Well #1 Construction |
Physical Address | View project details and contacts |
City, State (County) | La Crosse, WI 54603 (La Crosse County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $121,098 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Est. Completion Date: March 31, 2023 Construction will involve site preparation and construction of drinking water Test Well #1 for the Campbell Water Utility. The well will be located in Wardwell Park, Town of Campbell, on French Island, La Crosse County, Wisconsin. The work consists of drilling and testing a single formation, open borehole, partially cased well completed in the Mt. Simon aquifer. The Contractor must furnish all equipment and materials as necessary for construction and testing of the Test Well. This includes construction of any temporary access road or drill rig pad required to access this site and perform the drilling procedure. The surface elevation of the well site is approximately 652 feet. An estimated 140 feet of unconsolidated sand overlays sandstone. The Mt. Simon sandstone formation is expected to be encountered first as the Eau Claire formation is usually absent in the Mississippi River Valley. The sandstone will overlay bedrock at approximately 250 feet, elevation 402'. The static water level is encountered at 20-22 ft., an elevation of approximately 630 feet. The Owner has the right to stop construction of the well at any time or order the construction of another well nearby at the same unit prices. However, if the well is abandoned because of faulty construction, non-compliance with the specifications, inability of the Contractor to penetrate to the required depth, or any fault of the Contractor, no payment will be made for the abandoned well. Payment will be based on per unit of depth drilled or set below existing ground (BGL = Below Ground Level). 182 feet - 13.5-inch open hole 182 feet - 6-inch Inner Casing Grouting by Bradenhead 68 feet - 6-inch open hole Development and Test Pumping |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |