Similar Projects
New Pump Station
New Construction
Conception
$974,500 est. value
Waterloo, WI

Myrick Pump Station Improvements - 500 - City of La Crosse
Renovation, Infrastructure
Conception
$3,000,000 CJ est. value
La Crosse, WI 54601

Wellhouse #2 and Related Facilities
New Construction, Renovation, Infrastructure
Bidding
$84,405 CJ est. value
La Valle, WI 53941

South Side Pump Station Consolidation
Demolition, New Construction, Infrastructure
Bidding
$11,500,000 CJ est. value
Waukesha, WI 53186

Big Buck Lift Station Improvements Phase I
Post-Bid
Kenosha, WI 53142

Well House #2 Improvements Rebid
Infrastructure, Renovation
Post-Bid
$1,608,966 CJ est. value
Kendall, WI 54638

Booster Pumping Station, Contract Package 3 and 3A
Results
Waukesha, WI 53186

2021 WWTF Upgrade
Renovation
Results
Eagle River, WI 54521

Rehabilitation of the Green Island Sanitary Lift Station - 611 - City of La Crosse
Renovation
Conception
$550,000 CJ est. value
La Crosse, WI 54601

Well #3 Water Treatment Facilities
Infrastructure, Renovation
Bidding
$690,000 CJ est. value
Cambridge, WI 53523

Pump Station 17 Rehabilitation and Force Main Relief Phase 2
Renovation, Infrastructure
Post-Bid
Verona, WI

WWTP Diaphragm Pump Replacement
New Construction
Results
River Falls, WI

Green Meadows Storm Station Controls Upgrade - 683 - City of La Crosse
Renovation
Conception
$550,000 CJ est. value
La Crosse, WI 54601

City of Burlington - Well No 10 Maintenance and Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Burlington, WI 53105

Landfill Lift Station Modifications
Renovation
Post-Bid
Appleton, WI 54911

Last Updated 12/01/2022 04:16 PM
Project Title

Test Well #1 Construction

Physical Address View project details and contacts
City, State (County) La Crosse, WI 54603   (La Crosse County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $121,098 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Est. Completion Date: March 31, 2023 Construction will involve site preparation and construction of drinking water Test Well #1 for the Campbell Water Utility. The well will be located in Wardwell Park, Town of Campbell, on French Island, La Crosse County, Wisconsin. The work consists of drilling and testing a single formation, open borehole, partially cased well completed in the Mt. Simon aquifer. The Contractor must furnish all equipment and materials as necessary for construction and testing of the Test Well. This includes construction of any temporary access road or drill rig pad required to access this site and perform the drilling procedure. The surface elevation of the well site is approximately 652 feet. An estimated 140 feet of unconsolidated sand overlays sandstone. The Mt. Simon sandstone formation is expected to be encountered first as the Eau Claire formation is usually absent in the Mississippi River Valley. The sandstone will overlay bedrock at approximately 250 feet, elevation 402'. The static water level is encountered at 20-22 ft., an elevation of approximately 630 feet. The Owner has the right to stop construction of the well at any time or order the construction of another well nearby at the same unit prices. However, if the well is abandoned because of faulty construction, non-compliance with the specifications, inability of the Contractor to penetrate to the required depth, or any fault of the Contractor, no payment will be made for the abandoned well. Payment will be based on per unit of depth drilled or set below existing ground (BGL = Below Ground Level). 182 feet - 13.5-inch open hole 182 feet - 6-inch Inner Casing Grouting by Bradenhead 68 feet - 6-inch open hole Development and Test Pumping

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents