Similar Projects
Burger Park - 268 - City of Smyrna
New Construction
Conception
$250,000 est. value
Smyrna, GA 30080

Mount Bethel Christian Academy Athletic Facility
New Construction
Conception
$5,000,000 est. value
Marietta, GA 30062

St. Simons Elementary School Phase 4 - Kitchen, Admin, and Gym Addition
Addition, Demolition, New Construction, Infrastructure
Design
$4,950,000 CJ est. value
St Simons Is, GA 31522

New Construction of: East Coweta High School Softball Fieldhouse
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Sharpsburg, GA 30277

Additions and Renovations to: Newnan High School Softball Fieldhouse
Addition, Demolition, Renovation, Infrastructure
Bidding
$4,000,000 CJ est. value
Newnan, GA 30263

Richmond Hill High School Phase 4 Athletics
Renovation
Sub-Bidding
$25,000,000 CJ est. value
Richmond Hill, GA 31324

RFP Construction Manager at Risk - South Cobb High School Gymnasium Addition and Renovation
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$21,479,305 CJ est. value
Austell, GA 30106

Samuel B. Harris Gym Renovations
Renovation
Post-Bid
$150,000 est. value
Hinesville, GA

Construction of New Athletic Complex at the Treutlen County Schools
New Construction
Results
GA

New Indoor Practice Facility
New Construction - 36,184 SF
Results
Less than $11,500,000 est. value
Hamilton, GA 31811

Living Word Baptist Church Gymnasium
New Construction - 16,324 SF
Construction
$800,000 est. value
Loganville, GA 30052

White County High School Performing Arts Center and Athletic Complex
New Construction - 41,100 SF
Construction
$10,000,000 CJ est. value
Cleveland, GA 30528

Crossroads of Life Baptist Church
New Construction - 15,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Canton, GA 30114

Redeemer Presbyterian Church Elementary School
New Construction, Infrastructure - 30,000 SF
Pending Verification
$5,000,000 CJ est. value
Evans, GA 30809

Additions and Renovations to: Northgate High School Softball Fieldhouse
Addition, Demolition, Renovation, Infrastructure
Bidding
$4,000,000 CJ est. value
Newnan, GA 30265

Last Updated 10/02/2023 05:33 PM
Project Title

Construction Of Parkview High School - R. O. T. C. HVAC

Physical Address View project details and contacts
City, State (County) Lilburn, GA 30047   (Gwinnett County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of chain link fencing, patching of cmu walls, exterior concrete slabs on grade, drywall and framing, painting, plumbing, hvac, and electrical. All Pre-Qualified Bidders for this project shall attend the Pre-Bid Conference. FAILURE TO ATTEND SHALL RESULT IN DISQUALIFICATION OF THE BIDDER. Contract, if awarded, will be on a lump sum basis. Bids may not be withdrawn for a period of sixty (60) days after the date of receipt of bids. Bids shall be accompanied by a bid bond payable to Gwinnett County Board of Education in an amount equal to five percent of the base bid (Certified Checks NOT Acceptable). Performance Bond and Labor and Material Payment Bond, each amount equal to 100 percent of the contract sum, will be required of the successful bidder. These bonds shall be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of The Treasury Circular 570" and have an A.M. Best Company rating of at least Class "A", with a Financial Size of VI or better. Bonds must be accompanied by letter stating company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement. Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre- Construction meeting as soon as all required paperwork such as Contracts, Bonds, Insurance, etc. are in order. Contractor shall mobilize within ten (10) days of Notice to Proceed. All construction must be substantially complete by July 19, 2024. The Owner reserves the right to accept or reject any or all bids and to waive technicalities.

Details

12,510 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents