Similar Projects
26th Street West at 30th Avenue West Intersection Improvements
Infrastructure
Bidding
Bradenton, FL 34206

Low Bid Design Build I-275 At Skyway Attenuation
Infrastructure
Bidding
FL

Resurface Two Streets
Post-Bid
Bradenton, FL 34208

Civil/Site Construction Services
Post-Bid
FL

Myrtle Street Improvements, Phase 3
Results
Less than $2,536,473 est. value
Sarasota, FL 34234

44th Avenue East Extension Project - from 45th Street East to I-75
Results
Bradenton, FL 34205

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Bidding

15th Street E - US 301 Southbound Right Turn Lane
Post-Bid
FL

I-75 at 301 Interchange
Results
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Resurfacing
Results
Less than $3,535,794 est. value
FL

Bourneside Boulevard South Phase II
Results
$3,692,583 est. value
Sarasota, FL 34230

Miscellaneous Road Construction and Materials
Results
Bradenton, FL 34205

Intersection Improvement
Results
Less than $4,819,488 est. value
FL

Upper Manatee River Road at Port Harbour Parkway and Greenfield Boulevard / Copperlefe Drive Intersection Improvements
Results
Bradenton, FL 34212

Last Updated 06/10/2021 03:31 AM
Project Title

Milling and Resurfacing/Drainage Improvements/Lighting

Physical Address View project details and contacts
City, State (County) FL   (Manatee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $801,377
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements under this contract consist of access management improvements by the construction of 11' wide raised medians and 1' wide traffic separators along SR 45 (US 41) from 63rd Ave. W. to 53rd Ave. W. in Manatee County. Additional improvements include milling and resurfacing, signing and pavement markings, and intersection lighting retrofits. Section 0001 Roadway 0101- 1- Mobilization (43359235201) Ls 1.000 0101- 1- Mobilization (44404915201) Ls 1.000 0102- 1- Maintenance of Traffic (43359235201) Ls 1.000 0102- 1- Maintenance of Traffic (44404915201) Ls 1.000 0102- 14- Traffic Control Officer Hr 48.000 0102- 60- Work Zone Sign Ed 15,520.000 0102- 74- 1 Channelizing Device- Types I, Ii, Di, Vp, Drum, or Lcd Ed 67,330.000 0102- 74- 8 Channelizing Device- Pedestrian Lcd (Longitudinalchannelizing Device)fd 7,250.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 640.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 636.000 0102-104- Temporary Signalization and Maintenance, Intersection Ed 640.000 0102-107- 1 Temporary Traffic Detection and Maintenance,intersectioned 640.000 0102-115- Type Iii Barricade Ed 3,380.000 0104- 18- Inlet Protection System Ea 67.000 0107- 1- Litter Removal Ac 19.040 0107- 2- Mowing Ac 3.200 0110- 1- 1 Clearing & Grubbing (43359235201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (44404915201) Ls 1.000 0110- 4- 10 Removal of Existing Concrete Sy 568.000 0120- 6- Embankment Cy 1,914.800 0160- 4- Type B Stabilization Sy 159.000 0285-709- Optional Base, Base Group 09 Sy 159.000 0327- 70- 6 Milling Existing Asphalt Pavement, 1 1/2" Avg Depth Sy 20,527.000 0334- 1- 13 Superpave Asphaltic Conc, Traffic C Tn 22.600 0337- 7- 83 Asphalt Concrete Friction Course,traffic C, Fc-12.5, Pg 76-22tn 1,693.800 0520- 1- 10 Concrete Curb & Gutter, Type F Lf 5,740.000 0520- 70- Concrete Traffic Separator, Special- Variable Width Sy 409.000 0522- 1- Concrete Sidewalk and Driveways, 4" Thick Sy 20.000 0570- 1- 2 Performance Turf, Sod Sy 2,183.000 0591- 1-400 Irrigation Sleeve, 4" Diameter Lf 2,604.000 0999- 25- Initial Contingency Amount, Do Not Bid (43359235201) Ls 1.000 0999- 25- Initial Contingency Amount, Do Not Bid (44404915201) Ls 1.000 Section 0002 Signing 0700- 1- 11 Single Post Sign, F&i Ground Mount, Up to 12 Sf as 1.000 0700- 1- 12 Single Post Sign, F&i Ground Mount, 12-20 Sf as 5.000 0700- 1- 13 Single Post Sign, F&i Ground Mount, 21-30 Sf as 3.000 0700- 1- 60 Single Post Sign, Remove as 19.000 0705- 11- 3 Delineator, Flexible High Visibility Median Ea 318.000 0710- 11-290 Painted Pavement Markings, Standard, Yellow, Islandnosesf 5.000 0710- 90- Painted Pavement Markings, Final Surface (44404915201) Ls 1.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" for Stop Lineand Crosswalklf 158.000 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 40.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" for Diagonalor Chevronlf 72.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6-10 Dotted Extension Line, 6"Gm 0.020 0711- 16-101 Thermoplastic, Standard-other Surfaces, White, Solid, 6" Gm 0.749 0711- 16-102 Thermoplastic, Standard-other Surfaces, White, Solid, 8" Gm 0.026 0711- 16-131 Thermoplastic, Standard-other Surfaces, White, Skip, 6",10-30 Skip or 3-9 Lane Dropgm 2.288 0711- 16-201 Thermoplastic, Standard-other Surfaces, Yellow, Solid,6"Gm 2.640 0711- 16-231 Thermoplastic, Standard-other Surfaces, Yellow, Skip, 6" Gm 0.017 Section 0003 Lighting 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 110.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 585.000 0635- 2- 11 Pull & Splice Box, F&i, 13" X 24" Cover Size Ea 21.000 0715- 1- 12 Lighting Conductors, F&i, Insulated, No.8 - 6 Lf 2,781.000 0715- 4- 14 Light Pole Complete, Furnish & Install Standard Polestandard Foundation, 45' Mounting Heightea 3.000 0715- 4- 24 Light Pole Complete, Furnish & Install Standard Polespecial Foundation, 45' Mounting Heightea 1.000 0715- 4-815 Light Pole Complete, Furnish & Install Utility Conflictpole, Special Found, 30' Height, Project 433592-3-52-01ea 2.000 0715- 11-213 Luminaire, F&i- Replace Existing Luminaire on Existingpole/arm, Roadway, Pole Top Ea 11.000 0715-500- 1 Pole Cable Distribution System, Furnish and Install,conventional Ea 6.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents