Last Updated 04/08/2021 03:36 AM
Project Title

Lake Fork Ditch Box Culvert Extension

Physical Address View project details and contacts
City, State (County) Bement, IL   (Piatt County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

95 FT (0.018 miles); Extension of Existing Box Culvert on Upstream and Downstream Face Along With Guardrail Removal. Consists of construction of two cast-in-place double barrel 9’x6’ reinforced concrete box culvert extensions, 7’-3” in length each, minimal approach roadway improvement, and other related work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents