Similar Projects
NM-4 Transmission Line Replacement - Los Alamos County
Infrastructure
Conception
$6,000,000 CJ est. value
Los Alamos, NM 87544

NM-4 Transmission Line Replacement - Los Alamos County
Infrastructure
Conception
$6,000,000 CJ est. value
Los Alamos, NM 87544

Flex Laboratory at the Research Park
New Construction, Infrastructure - 83,000 SF
Design
$23,000,000 CJ est. value
Los Alamos, NM 87544

33rd 34th and Arkansas Road and Utility Improvements Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Los Alamos, NM 87544

33rd 34th and Arkansas Road and Utility Improvements Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Los Alamos, NM 87544

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Source Improvements Project
Infrastructure
Post-Bid
Los Alamos, NM

Y--NM-Valle De Oro NWR-Water Control Wetland 1 & 2 On
Term Contract
Results
Albuquerque, NM 87105

Aspen School Area Phase 2 Sewer Line R and R - Los Alamos County
Infrastructure
Conception
$268,500 CJ est. value
Los Alamos, NM 87544

Golf Course Site Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Los Alamos, NM 87544

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Aspen School Area Pipeline Phase 2 - Los Alamos County
Infrastructure
Conception
$831,000 CJ est. value
Los Alamos, NM 87544

Water System SCADA Study
Infrastructure
Post-Bid
Los Alamos, NM

Bathtub Row/Nectar/Peach - Los Alamos County
Infrastructure
Conception
$592,643 CJ est. value
Los Alamos, NM 87544

Engineering Services for NM502/Trinity Drive Safety and ADA Improvements
Infrastructure
Post-Bid
$592,124 CJ est. value
Los Alamos, NM 87544

Last Updated 10/21/2022 06:01 AM
Project Title

Central Avenue - 9th Street to Round-A-Bout - Los Alamos County

Physical Address View project details and contacts
City, State (County) Los Alamos, NM 87544   (Los Alamos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $351,252 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

WATER DISTRIBUTION - Central Avenue (Public Works Road Project) This will be a joint project between DPU and the Public Works Department to reconstruct Central Avenue from 9th Street to the NM-502 rounda-bout. There is currently no waterline in this section of Central Avenue and the gas line is undersized. A new waterline and gas line will be constructed to upgrade the systems and improve available fire protection to serve the redevelopment of the Mari Mac Village Shopping Center. Sections of sewer line will be rerouted to resolve conflicts with existing structures This project is in included in the County of Los Alamos FY 2023 - Adopted Budgets. As of October 21, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents