Similar Projects
North Plant Clarifier No. 2 Repair
Results
Less than $164,000 est. value
Evansville, IN 47708

Rivoli Theater Stabilization
Renovation
Post-Bid
Indianapolis, IN 46201

WWTP Digester Cleaning
Results
Mishawaka, IN 46544

WPCP Odor Control Improvements
Results
Fort Wayne, IN 46802

Wastewater Utilities Improvements
Results
Chesterfield, IN 46017

Fox Island Commercial On-Site Wastewater Facility
Results
Less than $300,000 est. value
Fort Wayne, IN 46809

WWTP Improvements Phase 2A - Sludge Processing Improvements and Phase 2B - New Sludge Processing Building
Post-Bid
Bristol, IN

Wastewater Treatment Plant Improvements
Results
Salem, IN

WWTP Rehabilitation and Expansion
Post-Bid
Sellersburg, IN

Wastewater Utility Rehabilitation
Post-Bid
Ladoga, IN 47954

Peak Excess Flow Treatment Facility Project
Post-Bid
Kokomo, IN

Wastewater Utility Improvements
New Construction
Post-Bid
Versailles, IN

West Wastewater Treatment Plant (West WWTP) Renewable Natural Gas (RNG) System
Bidding
Evansville, IN

Last Updated 12/29/2020 04:25 PM
Project Title

WWTP Final Clarifier Nos. 4-5, Aeration Tank Nos. 1-4 and Disinfection

Physical Address View project details and contacts
City, State (County) South Bend, IN 46628   (Saint Joseph County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes secondary and disinfection treatment improvements generally including replacing Aeration Tank Nos. 1 through 4 Pass 2 influent gates and Aeration Tank No. 4 drain gates, replacing aeration influent channel stop log, and lengthening aeration tank effluent weirs; replacing Final Clarifier Nos. 4 and5circular clarifier equipment and effluent troughs, structural rehabilitation, and replacing railing; expanding disinfection capacity by adding evaporators and scrubber and replacing associated feed equipment, piping and appurtenances; associated instrumentation and control and electrical modifications associated with the above improvements; and miscellaneous demolition and site work at the Wastewater Treatment Plant in South Bend, all more particularly described

Details

Division 44 - Pollution and Waste Control Equipment, Operation and Maintenance of Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Schedules for Pollution and Waste Control Equipment, Schedules for Waste Thermal Processing Equipment, Commissioning of Pollution and Waste Control Equipment, Commissioning Water Pollution Control Equipment, Noise Pollution Control, Odor Control, Solid Waste Control and Reuse, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents