Similar Projects
Artesia Public Schools Career Technical Education Building 1
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Artesia, NM 88210

Subway - Artesia
New Construction, Infrastructure - 2,344 SF
Bidding
$1,500,000 CJ est. value
Artesia, NM 88210

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

20th Street Reconstruction - Hermosa Drive to Main Street
Infrastructure
Post-Bid
Artesia, NM 88210

Eddy County West Loop Road - Lea Street Thru Hackberry Draw Project
Infrastructure
Results
$1,820,590 est. value
Carlsbad, NM

Roadway Reconstruction, Lighting, Signalization
Infrastructure
Results
NM

Dark Canyon Bridge Project - City of Carlsbad
New Construction, Infrastructure
Pending Verification
$10,100,000 CJ est. value
Carlsbad, NM 88220

Dark Canyon Bridge Project - City of Carlsbad
New Construction, Infrastructure
Pending Verification
$10,100,000 CJ est. value
Carlsbad, NM 88220

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Poplar Street - Roadway, Water and Sewer Improvements
Infrastructure
Results
$1,433,822 est. value
Loving, NM 88256

Kircher Street Construction - City of Carlsbad
Infrastructure, Renovation
Pending Verification
$850,000 CJ est. value
Carlsbad, NM 88220

Roads, Waste Water and Storm Drainage and Infrastructure Construction
Term Contract
Post-Bid
Carlsbad, NM

East Rose Street Sewer Improvements
Infrastructure
Results
Carlsbad, NM

Exterior Resurfacing of the Riverwalk Recreation Center
Infrastructure
Post-Bid
$585,536 CJ est. value
Carlsbad, NM 88220

Rainbow Boulevard Improvements Project
Infrastructure
Results

Last Updated 01/20/2023 11:38 AM
Project Title

Traffic Signalization Improvements - 14592 - City of Carlsbad

Physical Address View project details and contacts
City, State (County) Carlsbad, NM 88220   (Eddy County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,050,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construct a sewer line along National Parks Highway. Design and construct 12" diameter sewer interceptor 222 along the east side of National Parks Hwy from Chapman Road south to the city limits at Derrick Road. As of September 16, 2021, this project is included in the City of Carlsbad FY 2022-2026 CIP. Information regarding design team and contractor selection has not been disclosed. A firm timeline has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents