Project Title | Portage - Packwaukee, Hogan Road Bridges, B-11-68 and B-11-69; Madison - Portage, Baraboo River to CTH O |
Physical Address | View project details and contacts |
City, State (County) | Portage, WI 53901 (Columbia County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Excavation Common, 2,531 CY; Borrow, 1,299 CY; Base Aggregate Dense, 3,044 Ton; Marking Epoxy, 37,258 LF; Construction Staking, 63,400 LF; Construction Staking, 6 Each; Construction Staking, 1 LS; Storm Sewer Pipe, 8 LF 18“; Storm Sewer / Culvert Pipe Horizontal Elliptical or Pipe Arch, 81 LF 14” X 23”; Beam Guard, 29,810 LF; Beam Guard Energy Absorbing Terminals, 9 Each; Asphaltic Surface, 470 Ton; HMA Pavement, 3,935 Ton; Removing Asphaltic Surface Milling, 15,750 SY; Tack Coat, 1,575 Gals; Polymer Overlay, 991 SY. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |