Similar Projects
Mechanical, Electrical, Plumbing and Fire Alarm Job Order Contracting Statewide
Alteration
Post-Bid
Phoenix, AZ

Plumbing Services
Alteration
Post-Bid
Phoenix, AZ 85043

Plumbing and HVAC Repair and Maintenance Services
Alteration
Results
Tempe, AZ

Residential Emergency Plumbing, HVAC, and Roof Repairs and Replacements
Alteration
Results
$300,000 est. value
Scottsdale, AZ

McDowell Campground Updates
Alteration
Post-Bid
$130,000 est. value
Goodyear, AZ

North End Pavement Replacement
Infrastructure
Results
$2,784,704 CJ est. value
Yuma, AZ 85364

Flow Meters - New, Replacement Parts and Services
Term Contract
Post-Bid
Phoenix, AZ 85004

Hedgepeth Waterline Improvement District 51st Avenue to 47th Avenue Behrend Drive to Tonopah Drive
Infrastructure
Results
$6,173,189 CJ est. value
Phoenix, AZ 85004

48 inch Butterfly Valve
Infrastructure
Post-Bid
$300,000 CJ est. value
Phoenix, AZ 85004

Pinal County and Pima County (IR34 and IR42, Tohono O'odham Na)
Infrastructure
Results
$16,171,819 CJ est. value
Comobabi, AZ 85634

Lift Station 18-2 Wet Well Rehabilitation
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bullhead City, AZ 86442

Small Diameter Sanitary Sewer Rehabilitation Project FY 2022/2023
Infrastructure
Results
$3,873,092 CJ est. value
Phoenix, AZ 85004

Hedgepeth Waterline Improvement District Project
Infrastructure
Post-Bid
$6,173,189 CJ est. value
Phoenix, AZ 85004

Alvernon 24 inch Transmission Main / CIP W281
Infrastructure
Results
$3,545,404 CJ est. value
Tucson, AZ 85705

Water Conserving Plumbing Fixtures and Parts
Term Contract
Post-Bid
Phoenix, AZ 85004

Last Updated 08/20/2023 12:31 PM
Project Title

Water Line Replacement - 24th Street to 25th Street between 5th and 6th Avenue

Physical Address View project details and contacts
City, State (County) Yuma, AZ 85364   (Yuma County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $666,616 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Abandon the 2" AC water line from 24th Street to 25th Street between 5th and 6th Avenue and install 2-6" water lines from 24th Street to 25th Street, with one on 5th Avenue and the other on 6th Avenue. Existing water meters are in the back of the properties, new water meters need to be installed on the front of the properties. As well a new 12" PVC water line will be installed along 25th Street between 8th Avenue to approximately 145 feet east of 5th Avenue. Existing asbestos water line will be abandoned in place. These lines will have connected 2 fire hydrants and 14 water services. question Deadline 08/08/2023 at 11:00 AM MT Questions must be received through the Procurement Portal and so that a response may be posted as an addendum to the RFB through the Procurement Portal. The Work shall be substantially complete within 120 calendar days after the date when the Contract Times commence to run as provided in the Notice to Proceed, and all Work shall be finally completed and ready for final payment in accordance with the Notice to Proceed within 150 calendar days after the date when the Contract Times commences to run

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents