Similar Projects
Foothill Road: Dry Creek to Vilas Reconstruction - Jackson County
Infrastructure
Conception
$4,200,000 CJ est. value
Medford, OR 97504

Crews Road Reconstruction - Jackson County
Infrastructure
Conception
$528,000 CJ est. value
Medford, OR 97501

New Antennas
Alteration
Design
Ashland, OR

Southern Oregon Seismic Slopes Stability
Infrastructure
Design
$8,700,000 CJ est. value
Medford, OR 97501

Foothill Rd: Hillcrest to Mcandrews
Infrastructure
Bidding
$30,000,000 CJ est. value
Medford, OR 97504

Foothill Rd: Hillcrest to Mcandrews
Infrastructure
Bidding
$30,000,000 CJ est. value
Medford, OR 97504

2021 Water System Improvements - Radio Read Meter Replacement
Infrastructure
Post-Bid
$770,000 est. value
Jacksonville, OR

Patrick Elementary School and Sams Valley Elementary School Summer 2022 Parking Lot Improvements
Infrastructure
Post-Bid
$275,000 CJ est. value
Gold Hill, OR 97525

OR66 over RR Bridge and East Main Street over I-5 Bridge (Ashland)
Infrastructure, Renovation
Results
$2,680,360 CJ est. value
Ashland, OR 97520

2nd Street Improvements
Infrastructure
Results
$307,193 CJ est. value
Phoenix, OR 97535

Good Nite Place Mixed Use
New Construction, Infrastructure - 4,800 SF
Pending Verification
$10,000,000 CJ est. value
Talent, OR 97540

McAndrews Road Apartments
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Medford, OR 97504

Perimeter Road Improvements - Jackson County
Infrastructure
Conception
$350,000 CJ est. value
Medford, OR 97504

Stewart Market Phases 1 & 2
New Construction, Infrastructure - 4,060 SF
Design
$19,000,000 CJ est. value
Medford, OR 97501

Spiegelberg Track Replacement
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Medford, OR 97501

Last Updated 11/11/2022 12:11 PM
Project Title

Nova Avenue Storm Drain Replacement

Physical Address View project details and contacts
City, State (County) Eagle Point, OR 97524   (Jackson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of supplying all labor, equipment, and materials necessary to construct improvements including but not limited to the following approximate quantities for major work items: 90 LF Saw Cutting of Asphalt and Concrete 1570 SF Removal of Surfacing's (Asphalt and Concrete) 3 EA Large Tree and Stump Removal 30 LF 30" RCP Removal 140 LF 30" RCP Storm Drain with Rubber Gasket Joints 200 LF 18" Wide by 80 Mil Thick HDPE Root Shield Around Pipe Joints 18 LF 8" CL 52 DIP Water Main Replacement and Connections to 8" AC Pipe 3 TON Level 2, 1/2 " Dense, ACP Mixture for Trench Patching For inquiries concerning said project, contact Scott Pingle, City Engineer, (541) 772-5807. Bids shall only be made on forms furnished by KAS & Associates, Inc and will not be provided until the non- refundable fee is paid. A surety bond, cashiers, or certified check from the bidder, payable to the City of Eagle Point in the amount of ten percent (10%) of the bid must accompany each bid as security. All projects require the Contractor to provide a "Performance" bond and a "Payment" bond, each equal to the total amount of the contract. The bidder must include with the bid a completed Oregon Bidder Residency Statement and Non- Collusion Affidavit included with the contract documents. No bid will be received or considered unless the bidder is registered with the Construction Contractor's Board as required by provisions by ORS 701.021. Bidders shall submit proof of pre-qualification for classes of work described above at least five days prior to the opening of the bids. All projects in excess of $50,000.00 require the Contractor to pay prevailing wage rates. No bid shall be considered unless the Compliance Statement is signed and completed by the bidder as part of the bid that the provisions of ORS 279C.800 through 279C.870 Prevailing Wage Rates will be complied with. Contractors awarded a contract must provide proof of required insurance (as required in the City's contract form) at the time of execution of the contract. A contract is not accepted unless such proof of insurance is provided. The City of Eagle Point may reject any bid not in compliance with all prescribed public bidding procedures and requirements and reserves the right to reject for any good cause or all bids, waive formalities, or to accept any bid which appears to serve the best interest of the City. Engineer's estimate is $60k - $70k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents