Project Title | Nova Avenue Storm Drain Replacement |
Physical Address | View project details and contacts |
City, State (County) | Eagle Point, OR 97524 (Jackson County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $70,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work shall consist of supplying all labor, equipment, and materials necessary to construct improvements including but not limited to the following approximate quantities for major work items: 90 LF Saw Cutting of Asphalt and Concrete 1570 SF Removal of Surfacing's (Asphalt and Concrete) 3 EA Large Tree and Stump Removal 30 LF 30" RCP Removal 140 LF 30" RCP Storm Drain with Rubber Gasket Joints 200 LF 18" Wide by 80 Mil Thick HDPE Root Shield Around Pipe Joints 18 LF 8" CL 52 DIP Water Main Replacement and Connections to 8" AC Pipe 3 TON Level 2, 1/2 " Dense, ACP Mixture for Trench Patching For inquiries concerning said project, contact Scott Pingle, City Engineer, (541) 772-5807. Bids shall only be made on forms furnished by KAS & Associates, Inc and will not be provided until the non- refundable fee is paid. A surety bond, cashiers, or certified check from the bidder, payable to the City of Eagle Point in the amount of ten percent (10%) of the bid must accompany each bid as security. All projects require the Contractor to provide a "Performance" bond and a "Payment" bond, each equal to the total amount of the contract. The bidder must include with the bid a completed Oregon Bidder Residency Statement and Non- Collusion Affidavit included with the contract documents. No bid will be received or considered unless the bidder is registered with the Construction Contractor's Board as required by provisions by ORS 701.021. Bidders shall submit proof of pre-qualification for classes of work described above at least five days prior to the opening of the bids. All projects in excess of $50,000.00 require the Contractor to pay prevailing wage rates. No bid shall be considered unless the Compliance Statement is signed and completed by the bidder as part of the bid that the provisions of ORS 279C.800 through 279C.870 Prevailing Wage Rates will be complied with. Contractors awarded a contract must provide proof of required insurance (as required in the City's contract form) at the time of execution of the contract. A contract is not accepted unless such proof of insurance is provided. The City of Eagle Point may reject any bid not in compliance with all prescribed public bidding procedures and requirements and reserves the right to reject for any good cause or all bids, waive formalities, or to accept any bid which appears to serve the best interest of the City. Engineer's estimate is $60k - $70k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |