Similar Projects
Menards / Bradley
New Construction, Infrastructure - 200,000 SF
Design
$25,000,000 CJ est. value
Bradley, IL 60915

Menards / Bradley
New Construction, Infrastructure - 200,000 SF
Design
$25,000,000 CJ est. value
Bradley, IL 60915

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
Kankakee, IL

IVHM FY22 Concrete
Alteration
Results
Manteno, IL 60950

Various Highways throughout District 3
Infrastructure
Results

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

SN 046-0047 carries US 45/52 over South Branch Rock Creek approximately 1.5 miles South of County Highway 9
Infrastructure
Results
IL

HMA Maintenance Overlay
Infrastructure
Post-Bid
$1,107,000 est. value
Manteno, IL

2021 Parking Lot Replacement at Edison Primary School
Infrastructure
Results
Kankakee, IL 60901

Asphalt Repair Services - Shapiro
Alteration
Post-Bid
$300,000 est. value
Kankakee, IL 60901

RR-21-4821 Pavement Repairs
Infrastructure
Results

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Roadway and Drainage Improvements
Renovation, Infrastructure
Results
$95,227 est. value
Bourbonnais, IL 60914

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Last Updated 03/23/2023 12:04 AM
Project Title

2022 RLF Concrete Program

Physical Address View project details and contacts
City, State (County) Bradley, IL 60915   (Kankakee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $478,482 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bids are invited upon the several items and quantities of work as follows: Item 1-PCC Sidewalks and Driveways 35,500 SQ FT Item 2- PCC Curb and Gutter 700 FOOT Item 3-Detectable Warnings 500 SQ FT Item 4- HMA Driveways and Patching 1,000 SQ YD Item 5- Aggregate Driveways 210 SQ YD Item 6- Structures to be adjusted 20 EACH Item 7- Tree Removal 200 UNIT. Attention is called to the fact that not less than minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. The Village of Bradley reserves the right to reject any or all Bids or to waive any informalities in the bidding. Bids may be held by The Village of Bradley for a period not to exceed 30 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents