Reported | 01/06/2022 12:00 AM |
Project Title | Vertical Lift Railroad Bridge Repairs, Cape Cod Canal, Buzzards Bay, Ma |
Physical Address | View project details and contacts |
City, State (County) | Buzzards Bay, MA (Barnstable County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $250,000 to $500,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The substructure is labeled abutment A, pier B, pier C and abutment D from south to north. The total length of the bridge is 806 feet from center-to-center of abutment bearings and supports a single railroad track on an open timber tie deck. All spans are composed of riveted steel through trusses. The main lift span is 544 feet, center-to-center of live load bearings. The following items to be included in the design package: Replacement of lower span lock/gear box assembly on the North and South piers. Replacement of the existing 5HP, 3Ø, 460V lower span lock motor on both the North and South Piers and replacement of the existing motor disconnect switch. The project may also include the replacement of associated conductors for the motor control. This replacement effort would remove and replace the existing pullbox and control conductors, while allowing the existing limit switches to remain; this replacement effort will be a combination of conduit and flexible industrial grade cables. To be confirmed with project office. The environmental conditions require that all replacement electrical materials to be NEMA 4X stainless steel enclosures, PVC coated rigid steel conduit, and industrial approved control cabling. Replacement of North and South pier wear plates (2 on each side) to their original thickness. Replacement of the upper and lower Southeast guide rollers and associated bearings, guide roller shaft, adjustment flange, and any locking/mounting hardware are all to be replaced. The other six East/West lateral guide rollers are to be assessed and adjusted if required to be within defined operational tolerances. |
||||||||||||||||||||
Details | Bridge, Renovation.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||