Similar Projects
Last Updated | 03/23/2023 11:24 AM |
Project Title | New Fuel Farm Oskaloosa Municipal Airport |
Physical Address | View project details and contacts |
City, State (County) | Cedar, IA 52543 (Mahaska County) |
Category(s) | Heavy and Highway, Transportation |
Sub-Category(s) | Airline/Passenger Terminal, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The major work items and approximate quantities involved in the proposed work are: Project: Mobilization and Miscellaneous – LUMP SUM; Traffic Control – LUMP SUM; Unclassified Excavation – 76 CY; Subbase Coarse (Granular) 12” thick – 136 SY; Storm Sewer, Trenched, RCP Class V, 12” – 56 LF; PCC Pavement (8” Thick Continuous Reinforcement) – 114 SY; 4,000 Gallon Aboveground Storage Tanks – 2 EA; Aviation Fueling Equipment – 2 EA; Aviation Fuel Piping – 75 LF; Card Reader Terminal – 1 EA; Tank Monitoring Panel w/ Automatic Tank Gauging Level Probes, Interstitial Sensors – 1 EA; Electric Work for Fueling System: Grounding Ring for Tank Area, Bonding Equipment and Piping, Light Pole & Fixture Providing Breakers, Conduit, Wiring, Etc. Each bidder must deposit with his bid, in a separate sealed envelope, a certified check or cashier's check, drawn on a solvent state or national bank, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, and shall be in an amount equal to 5% of his bid, and made payable to the Oskaloosa Municipal Airport Commission, Oskaloosa, Iowa as security that if awarded the contract by resolution of the Oskaloosa Municipal Airport Commission, Oskaloosa, Iowa, he will enter into a contract at the prices bid and will furnish the required performance and payment bonds. The successful bidder will be required to furnish a Performance Bond and a Payment Bond, each in an amount equal to 100 percent of the contract price. A DBE contract goal of 3 percent has been established for this contract. The Oskaloosa Municipal Airport Commission reserves the right to reject any or all bids and to waive irregularities not affecting their competitive conditions. Also reserved is the right to accept or reject individual groups. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |