Similar Projects
UDOT Sandblasting, Painting, Welding, and Fabrication - Region 4 Price Area
Term Contract
Bidding

UDOT Sandblasting, Painting, Welding, and Fabrication - Region 4 Price Area
Term Contract
Bidding

Aquatic Center Boiler Replacement Project
Post-Bid
Roy, UT 84067

Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

Construction: Westbrook Elementary, Boiler Replacement
Results
Taylorsville, UT 84129

East Layton Elementary Boiler and Chiller Replacement
Results
$125,000 to $250,000 est. value
Layton, UT 84040

Mckinley Elementary School Boiler Replacement Project
Post-Bid
Tremonton, UT 84337

Boiler Installation
Results
Ephraim, UT 84627

Water Chiller Rental Unit - Hill Air Force Base
Term Contract
Post-Bid
Hill AFB, UT 84056

Hot Water Summer Boiler
Results
Ephraim, UT 84627

DFCM Construction Pre-Qualification (General, Electrical, Mechanical, Roofing, Paving and Civil)
Post-Bid
Less than $3,500,000 est. value
Salt Lake City, UT 84129

Boiler Replacement
Term Contract
Results
Salt Lake City, UT 84112

On-Call Task Order General Mechanical Construction Services
Term Contract
Post-Bid
Salt Lake City, UT 84114

Sego Lilly Elementary School Mechanical Upgrade
Results
Lehi, UT 84043

2020 Dive and Splash Pools Boiler Replacement
Post-Bid
Kearns, UT 84118

Reported 06/16/2021 12:00 AM
Project Title

Steam Plant Upgrades - Projects B1286 at Hill AFB

Physical Address View project details and contacts
City, State (County) Hill AFB, UT 84056   (Davis County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Project involves the replacement of boilers in B1286 at Hill AFB in Utah. There are three boilers in B1286. This project will replace the existing three boilers in B1286 with two new boilers. Each new boiler will be in compliance with BACT requirements for serious nonattainment under the Clean Air Act. The three boilers being replaced are 50 MMBU (~1500 boiler HP) dual fuel steam boilers. The project will replace the existing boilers in B1286 with new boilers of enough quantity and size to meet demand, as well as BACT.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents