Similar Projects
Camp Highland Bridge Replacement - 2-212 - City of Smyrna
New Construction
Conception
$1,500,000 est. value
Smyrna, GA 30082

Tolleson Park Trail Bridges - City of Smyrna
New Construction
Conception
$250,000 est. value
Smyrna, GA 30080

SR 109 at NS #719349N
New Construction
Design
$1,000,000 est. value
Greenville, GA 30222

SR 16 at Flint River 8 Mi W of Griffin
New Construction, Infrastructure
Design
$6,000,000 est. value
Griffin, GA 30224

Construction of a Bridge and Approaches
New Construction, Infrastructure
Bidding
$5,000,000 est. value
Atlanta, GA 30329

2022 City Bridge Repairs
New Construction, Infrastructure
Bidding
$800,000 est. value
Thomasville, GA

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

I-285 Eastside Bridges Replacements
Results
GA

Bridge Repairs
Results
Watkinsville, GA 30677

CR 185 / Asbury Road at Clear Creek
Renovation, Alteration
Design
$1,000,000 est. value
Irwinton, GA

Construction of a Bridge and Approaches on SR 101
New Construction
Bidding
$4,000,000 est. value
Rockmart, GA 30153

2021 Bridge Repair Projects
Renovation
Post-Bid
Georgetown, GA

Retrofitting an Existing Railroad Trestle Bridge with a Concrete Deck for the Covington Cricketfrog Trail
Results
Covington, GA

CR 101 / Lower Cartecay Rd at Cartecay River 6 Mi Se of Ellijay
New Construction
Design
$2,000,000 est. value
Ellijay, GA 30536

Last Updated 07/12/2022 01:15 AM
Project Title

Construction of a Bridge and Approaches on Findley Road (CR 157)

Physical Address View project details and contacts
City, State (County) Pinehurst, GA   (Dooly County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0.213 mile of construction of a bridge and approaches on findley road (cr 157) over I-75/sr 401.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents