Similar Projects
Last Updated | 04/16/2021 11:42 AM |
Project Title | Flooding Repairs - Waisman Center |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI (Dane County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $136,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general the work consists of: saw cutting the existing slab on grade to install a new drain tile system. The drain tile system will tie into the existing fiberglass crock. Once the drain tile is replaced, a new slab will be installed along with waterstops. There will be some miscellaneous MEP repair required to replace damaged corroded equipment. Existing steel at the mechanical equipment supports and the base of the stair stringers will require sand-blasting and repainting. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |