Project Title | Nancy Ryles Elementary School Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Beaverton, OR 97007 (Washington County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,100,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The purpose of this Invitation to Bid is to obtain competitive bids for retaining a General Contractor (GC) or roofing contractor to furnish, install, manage, and coordinate all the work on behalf of the Beaverton School District. The goal is to replace the Nancy Ryles Elementary School Roof. GENERAL SCOPE OF WORK Please refer to attached plans and specifications. It is intended that the Contractor provides a complete project and coordinates work with the District, Contractors and Consultants hired by the District, and all applicable agencies having authority. a. Work to include supplying, storing and handling of all required materials. b. Work includes protection of neighboring finishes and replacement/repair of any damaged surfaces including but not limited to sheet metal, exterior wall finishes, roof mounted equipment, sidewalks and surrounding landscape areas. c. Contractor shall provide all labor, materials, equipment, transportation, and other facilities and services as necessary and/or required to execute all of the Work. d. All work areas shall be cleaned of any construction debris on a daily basis. General Contractor is responsible for material removal and disposal. Upon completion of the project, the General Contractor is to provide final cleaning of all work installed, replaced or repaired including jobsite office. e. Carefully review specification of Division 7 and be prepared to submit a Moisture Mitigation Plan as part of your initial submittals shortly after contract execution. f. Prepare to submit product data for all roofing materials within 10 days of a fully executed contract and provide proof of ordered material within 30 days after the fully executed contract. District is amenable to paying for materials or a portion of the materials upon confirmation of order. g. Carefully review all documents for the site. Below is only a summary of the work. a. Nancy Ryles' work is to remove and replacement of a built-up roof with built-up roof. The project is over the low slope portions of the building where built up roof exists, including the covered play area. Cleaning steep slope roof per roof assessment recommendations. See Contract Documents for more detailed description. |
||
Details | 86,440 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |