Similar Projects
Reinig Road Culvert Replacement on Brockway Creek
New Construction
Design
$500,000 est. value
WA

Fmd Burien Court House Retrofit
Renovation
Bidding
$600,000 est. value
WA

Sodium Hypochlorite for Wastewater Treatment
New Construction, Term Contract
Bidding
$930,000 est. value

Thickening and Dewatering Polymer Services
Renovation
Post-Bid
University Place, WA 98467

Big Gulch WWTF Dewatering System Replacement
Renovation
Post-Bid
$675,000 est. value
Mukilteo, WA 98275

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Water Filtration Plant Phase 2
New Construction
Results
Everett, WA

Sodium Hypochlorite Facilities Upgrade
Renovation
Bidding
Richland, WA

Testing of Backflow Preventers
Renovation
Post-Bid
WA

West Pasco Water Treatment Plant Improvements: Phase 1
New Construction
Results
$8,382,834 est. value
Pasco, WA 99301

Water System Improvements
Renovation
Post-Bid
$1,500,000 est. value
Issaquah, WA 98027

Downtown Wells Treatment Facility Upgrade
New Construction
Results
$950,000 to $1,050,000 est. value
Yelm, WA

Water Station 7 Sodium Hypochlorite and Fluoridation Systems
New Construction
Results
$630,000 est. value
Vancouver, WA 98684

Clark Regional Wastewater District - 2022 Salmon Creek Treatment Plant Restoration and Repair Projects
New Construction, Renovation
Results
$2,645,699 est. value
Vancouver, WA 98685

Last Updated 04/04/2022 05:34 PM
Project Title

Clark Regional Wastewater District - Phase 5A Project: Package 2 - Salmon Creek Treatment Plant Columbia River Effluent Pipeline

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98685   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,500,000 to $15,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes construction of approximately 6,160 feet of 48-inch effluent pipeline including a bored crossing of the BNSF railroad, two river crossings (Salmon Creek and Lake River), a connection tot he existing effluent pump station pipeline, a connection to the existing effluent pipe at Lower River Road, bypass systems, pipe bedding material, and all other work as describe.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents