Similar Projects
One Time Purchase of Electrical Supplies for Repairs at Waggaman Playground
Term Contract
Sub-Bidding
$194,000 CJ est. value
Westwego, LA 70094

Supply and Install Electrical Outlets onto Existing Utility Poles for the Jefferson Parish Parkways Department
Alteration
Post-Bid
LA

Preventative Maintenance and Repairs of Electrical Switchgear and Related Equipment for the Jefferson Parish Department of Public Works Water
Term Contract
Post-Bid
LA

Furnish all Labor, Materials and Equipment Necessary to Remove and Replace Lighting and Install Hand Dryers for Jefferson Parish East Bank Drainage
Alteration
Results
Gretna, LA

Cast Iron Street Light Access Panels
Alteration
Results
New Orleans, LA

Provide Plumbing, HVAC, Information Technology and Electrical Service
Alteration
Post-Bid
LA

Upgrades to Field Lighting at Bonnabel Baseball Field
Infrastructure
Results
$302,250 CJ est. value
Kenner, LA 70065

Cals Surgical Lights Package
Alteration
Post-Bid
LA

HML Repairs
Alteration
Results
$200,000 est. value
New Orleans, LA 70126

Electrical Panels - OJJ
Alteration
Post-Bid
Bridge City, LA

Lighting and Electrical Upgrades for West Jefferson High School Stadium
Renovation
Results
$425,341 CJ est. value
Harvey, LA 70058

Electrical Repair for Wesley Barrow Stadium
Alteration
Post-Bid
New Orleans, LA 70126

UPS all Battery Preventive Systems Maintenance
Term Contract
Post-Bid
New Orleans, LA 70119

Lafitte Greenway Electrical Repiars
Alteration
Post-Bid
New Orleans, LA 70112

Install 70 Foot Stadium Light Pole for Jefferson Parish Recreation Department
Alteration
Post-Bid
Jefferson, LA

Last Updated 03/07/2023 01:21 PM
Project Title

Labor and Materials to Remove, Supply and Replace for Upgrade of Allis-Chalmers Switchgear Technology

Physical Address View project details and contacts
City, State (County) Marrero, LA 70072   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $570,102 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

DEADLINE FOR QUESTIONS IS JANUARY 11, 2023 BY 2:00 P.M Bid Surety Bond is 5% of the total bid price. Performance Bond is 50% of the contract amount. Payment Bond is 50% of the contract amount. All bidders must attend the Mandatory pre-bid conference and will be required to sign in and out as evidence of attendance. In accordance with LA R.S. 38:2212(I), all prospective bidders shall be present at the beginning of the Mandatory pre-bid conference and shall remain in attendance for the duration of the conference. Any prospective bidder who fails to attend the conference or remain for the duration shall be prohibited from submitting a bid for the project. The existing 15 kV Allis-Chalmers FC Switchgear contains the original vintage air magnetic circuit breakers and electro-mechanical relay protection and was manufactured and installed in 1970. Additionally, the breakers rack into the switchgear using a floor ratchet system and is obsolete when compared to current remote racking technology. The electrical switchgear is old, sheltered isle, outdoor switchgear located within an electric room shell building. The switchgear enclosure, instrument transformers, bussing, and cables are in good working order and have regular maintenance performed. Contractor shall modernize the circuit breaker technology from Air Magnetic to Vacuum and replace the ratchet racking system with a remote racking device with 25 pendant to a controller. Additionally, all (5) switchgear doors will be replaced with new solid state SEL-751 Relays, Relay Test Switches, Electro-Switch breaker control switches, Red/Green push-to test LED pilot lights. On the main and tie breakers, Contractor shall provide kirk key interlock for manual transfer. The above solution replaces the outdated circuit breakers and relays while reusing and not disturbing the existing switchgear enclosure, bussing, instrument transformers, and cables. The Parish of Jefferson expects an additional 30-35 years of service life from the switchgear with recommended maintenance and the elimination of end-of-life components and ratchet racking system

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents