Similar Projects
Last Updated | 03/07/2023 01:21 PM |
Project Title | Labor and Materials to Remove, Supply and Replace for Upgrade of Allis-Chalmers Switchgear Technology |
Physical Address | View project details and contacts |
City, State (County) | Marrero, LA 70072 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $570,102 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DEADLINE FOR QUESTIONS IS JANUARY 11, 2023 BY 2:00 P.M Bid Surety Bond is 5% of the total bid price. Performance Bond is 50% of the contract amount. Payment Bond is 50% of the contract amount. All bidders must attend the Mandatory pre-bid conference and will be required to sign in and out as evidence of attendance. In accordance with LA R.S. 38:2212(I), all prospective bidders shall be present at the beginning of the Mandatory pre-bid conference and shall remain in attendance for the duration of the conference. Any prospective bidder who fails to attend the conference or remain for the duration shall be prohibited from submitting a bid for the project. The existing 15 kV Allis-Chalmers FC Switchgear contains the original vintage air magnetic circuit breakers and electro-mechanical relay protection and was manufactured and installed in 1970. Additionally, the breakers rack into the switchgear using a floor ratchet system and is obsolete when compared to current remote racking technology. The electrical switchgear is old, sheltered isle, outdoor switchgear located within an electric room shell building. The switchgear enclosure, instrument transformers, bussing, and cables are in good working order and have regular maintenance performed. Contractor shall modernize the circuit breaker technology from Air Magnetic to Vacuum and replace the ratchet racking system with a remote racking device with 25 pendant to a controller. Additionally, all (5) switchgear doors will be replaced with new solid state SEL-751 Relays, Relay Test Switches, Electro-Switch breaker control switches, Red/Green push-to test LED pilot lights. On the main and tie breakers, Contractor shall provide kirk key interlock for manual transfer. The above solution replaces the outdated circuit breakers and relays while reusing and not disturbing the existing switchgear enclosure, bussing, instrument transformers, and cables. The Parish of Jefferson expects an additional 30-35 years of service life from the switchgear with recommended maintenance and the elimination of end-of-life components and ratchet racking system |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |