Similar Projects
Infrastructure Improvements Projects-Construction Qualifications
Term Contract
Bidding
Southfield, MI

Water Service Line Replacement Program
Bidding
Royal Oak, MI 48073

Water Quality Improvements
Post-Bid
Pontiac, MI

Bowers St. Water Main Replacement
Post-Bid
Birmingham, MI

Media Center Water Repair
Results
Less than $45,000 est. value
Rochester, MI

2019 PRV Rehabilitation
Results
Less than $119,610 est. value
Bloomfield Hills, MI

Troy Street Watermain Replacement
Post-Bid
Ferndale, MI

Water Main Replacement Phase 1
Results
Less than $457,317 est. value
Rochester, MI

Bedford Square and Tienken Court Water Main Replacement and Road Resurfacing Project
Post-Bid
Rochester Hills, MI

2019 Quarton Lake Sub Reconstruction Phase 1
Results
Birmingham, MI

2019 Water Main Project
Post-Bid
Oxford, MI

2019-20 Pavement Reconstruction and Water Main Repalcement Project
Results
Huntington Woods, MI

Water and Wastewater Conops 2019
Post-Bid
Wixom, MI

TRI-A Subdivision Watermain Replacement
Results
Less than $865,958 est. value
Walled Lake, MI

Neptune Water Meters
Post-Bid
Pontiac, MI

Reported 02/27/2019 12:00 AM
Project Title

Coolidge Highway Water Main Extension

Physical Address View project details and contacts
City, State (County) Berkley, MI   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description The project includes the extension of a 12" water distribution main along the west side of Coolidge Hwy. from immediately north of 12 Mile Rd. to Webster Rd. and westerly to connect to an existing 8" main near Kenmore Rd. The length of the project is approximately 2,700'. Approximately four (4) hydrants and eight (8) gate valves will be required. The existing section of 8" water main on the west side of Coolidge Hwy. that initiates from the valve immediately north of 12 Mile Rd. and terminates at Edwards Ave. will be capped and abandoned in place. The project also includes 12" water main extensions with gate valves on both Morrison Ave. and Edwards Ave. for possible future east/west connections in addition to sprinkler line extensions into the three (3) grass medians in Coolidge Hwy. for future irrigation plans. Several other design parameters include the requirement to open cut and install the new 12" water main and connection along Webster Road and locate this main based on the existing utilities on the south side (Berkley jurisdiction) of Webster Rd. Further, the existing water main alignment is in the road and will need to be maintained, which will require pavement removal and replacement on Webster Road
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents